Request For Proposal – GPSNR-RFP-A02-029-Risk Taskforce Traceability Pilot Field Trial – Thailand

Share This Post

Introduction & Background

 

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.

The Risk Subgroup of GPSNR is seeking a consultant/field team to identify, test, evaluate and report on what effort may be required for a rubber processor to map their supply shed (i.e., all the farms that they are sourcing from) in complex supply chains such as in Indonesia and Thailand. 

 

Objectives

The goal of the pilot is to investigate what effort (i.e., time, effort, cost, labour) may be required for a rubber processor to map their supply chain in complex supply chains such as Indonesia and Thailand.

The goal of this pilot is to map at least 300 small holder farmers supplying one processing mill each in Thailand. The subgroup is open to negotiation on the total number of small holder farms mapped based on the service provider’s experience and estimation.

The service provider should work with the GPSNR Risk Subgroup and the participating processors from Thailand and their dealers to:

  1. Keep track of time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each farm, and provide them to their GPSNR Point of Contact at the end of the survey.
  2. Register and map farmers using field-based mapping or in combination with remote sensing that is crossed checked with field-based mapping samples. The service provider is welcomed to use their own method.
    1. Collect and provide the shapefiles from the mapping at the end of the project to the point of contact and the participating processor.
  3. Ask farmers to answer the RubberWay questionnaire.
  4. Ask farmers to answer the HCVRN Nature Positive Farming questionnaire.
  5. Unless automatically uploaded, submit farmers’ responses to the respective databases and the GPSNR point of contact at the end of each day for compilation.
  6. Record the effort required to convince 300 farmers per processing mill to complete all 3 tools.
    1. Number of dealers and farmers contacted to identify 300 farmers willing to participate in study.
    2. Total person hours required to identify 300 willing suppliers.
    3. Details of incidental (not staff time) expenses required to identify 300 willing farmers.
  7. Record the effort required/difficulty to convince the super dealers/suppliers to participate in the study, based on the supplier tiers & on the pilot sample goal.
    1. Skip Tier 1 farms
    2. Not more than 100 responses from Tier 2
    3. 200 responses from Tier 3 and 4 suppliers

Scope of Work

  • Field data collection has to be completed by the second month from the starting date of the project.
    • Ideally, field teams are experienced in 2 or more of the above tools (RubberWay questionnaire, HCVRN Nature Positive Farming questionnaire and field-based or remote sensing-based mapping), else training will be provided. Please indicate which tools your team is experienced in using we will provide the necessary training.
      • If remote-sensing based is preferred by the service provider, please respond with the process and note that the data has to be cross-checked with field-based samples.
    • Field teams have to be able to speak the local language at each survey location(i.e., Thai).
  • GPSNR estimates the necessary activities per farm and the time required to conduct them to be as follows:
  1. Explain purpose of visit (~15 mins)
  2. Get permission for personal data collection to ensure data protection (~5mins)
  3. Map farm via mapping based on the mapping method chosen by the service provider (e.g., field-based mapping or remote sensing cross-checked with field samples) (~90mins).
    1. Mapping for farms <4 hectares:
      1. Polygon mapping or GPS mapping is up to the discretion of the service provider.
    2. Polygon mapping for farms above 4 hectares:
      1. This is based on the EU regulation (see Annex A) that a polygon would be required for farmers over 4 hectares.
      2. At least 10% (~30 of the 300 farms must be polygon mapped)
    3. Fill in RubberWay questionnaire (~30mins)
    4. Fill in HCVRN Nature Positive Farming questionnaire (~30mins – 1 hour)
    5. Verify data before departure (~10mins)
  • GPSNR assumes:
    • Total time required: ~approximately 180 mins/3 hours per farm per field assistant.
    • Farms likely to be covered per day: 2 farms.
    • Total number of field assistant days required assuming 2 farms per day: 450 days
    • Total weeks required for 1 field assistant assuming 5 work days per week: 90 weeks
    • Total weeks required for two processors assuming 10 field assistants working simultaneously in one country: 9 weeks
    • This is an estimation of the time taken, we look forward to a comparison with the final recorded timings.
  • If you have other ideas on how to achieve the above objectives, please provide details about how you would design the study

Expected Deliverables

Specifically, GPSNR expects the consultant to:

 1. Map at least 300 farmers supplying to the participating processor in Thailand and provide the shapefiles to the processor and the GPSNR point of contact.

a.      There should at least be 10% (~30 farms out of 300 farms) that are polygon mapped, based on the requirements mentioned above and in Annex A.

 2. We would like a detailed account of the time and resources spent on 1. travelling to the farm, 2. On the farm and 3. Data analysis

a.      We would like to see a breakdown of the total time spent in each component. E.g., Total reported time spent on 1 farm + 1 analysis = 8hours, within that 2 hour (time taken to travel to farm), 0.5 hours (convincing the farmer), 0.5 hours (communicating to farmer about the tool), 20 mins (Mapping the farms), 30 mins (HCVN questionnaire), 30 mins (Rubberway questionnaire)

 3. An evaluation of the merits and limitations of each tool

a.      E.g., 3/11 farmers surveyed were more apprehensive about the mapping tool due to fear of exposing their location.

 4. A recommendation of the scalability of this pilot

a.      Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

b.     E.g., $X/farm is calculated but is not scalable due to what reason(s).

Proposal Format and Contents

The proposal should include the following:

1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

2. The timeline and key stages of operations based on Project Timeline below

3. Budget, including detailed breakdown of expected manpower, logistics, and costs based on Budget below

4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

 

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 10 March 2023 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and cheryl@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Project Timelines

 

Proposals submitted by consultant to stefano.savi@gpsnr.org

10 March 2023

Selection of consultant /
Notification to Unsuccessful Bidders

16 March 2023

Contract Award / Notification to Unsuccessful Bidders

17 March 2023

Initial methodology presentation and Q&A with subgroup

23 March 2023

Training sessions for tools 

Late March – Early April 2023

Update session with subgroup 

April 2023

Final Draft report and conclusion of project 

July 2023

 

Budget

The Platform is anticipating that a total budget of no more than €25,000 be allocated to this engagement.

Payment terms shall be:

·        20% at the signing of the contract

·        30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan.

·        50% on delivery of the final report

The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.

 

Evaluation Factors

 GPSNR will rate proposals based on the following factors, with cost being the most important factor:

1.        Responsiveness to the requirements set forth in this Request for Proposal

2.      Relevant past performance/ experience

3.      Samples of work

4.     Cost, including an assessment of total cost of ownership.

5.      Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

Annex

Annex A: EU Deforestation Regulation

‘geolocation’ means the geographical location of a plot of land described by means of latitude and longitude coordinates corresponding to at least one latitude and longitude point and using at least six decimal digits. For relevant commodities other than cattle, for plots of land of more than 4 hectares, the geographical location shall be provided using polygons, meaning sufficient latitude and longitude points to describe the perimeter of each plot of land.

Text obtained from Article 2: Definitions, point (29) of the Deforestation Regulation consolidated text dated 20/12/22Deforestation Regulation consolidated text 20-12-22

More To Explore

Request for Proposal – Oversight

FEBRUARY 2026 

ISSUED BY 
Global Platform for Sustainable Natural Rubber 

Introduction & Background 

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

The GPSNR Assurance System, designed by Assurance Services International (ASI) and for GPSNR members, is a risk-based framework that supports credible and independent assurance processes. It enables companies to identify and mitigate human rights and environmental risks within their supply chains, undergo third-party verification, and report transparently on their progress through credible claims.

As part of its Assurance System, GPSNR operates an oversight mechanism to ensure that approved Assurance Service Providers (ASPs) deliver assessment and assurance services in conformity with GPSNR requirements. This oversight function is a critical component of maintaining the credibility, consistency, and integrity of the GPSNR Assurance System.

GPSNR is therefore seeking proposals from qualified and experienced individuals or organizations to provide GPSNR Oversight Assessor services in accordance with GPSNR oversight procedures and requirements.

The Engagement 

The GPSNR Secretariat is seeking one or more qualified Oversight Assessors to support GPSNR in planning, conducting, and reporting on oversight assessments of Assurance Service Providers. The selected provider(s) will support GPSNR in ensuring that ASPs continue to meet approval requirements and effectively implement GPSNR assurance procedures.

Scope of Work

The Oversight Assessor(s) shall perform oversight activities in line with the GPSNR Oversight Procedure. The scope of work may include, but is not limited to, the following activities:

Oversight Assessment Activities

  • Conduct 5-10 desk reviews of applicant or approved Assurance Service Providers, including review of documented procedures and records.
  • Conduct 5-10 office assessments (remote or on-site, as required) to evaluate conformity with GPSNR requirements and the effectiveness of ASP management systems.
  • Conduct 5-10 witness assessments by observing ASP assessors or assessor teams during GPSNR field assessments.
  • Apply appropriate oversight assessment techniques, including document review, interviews, and witnessing of audit activities.

Assessment Preparation and Planning

  • Support GPSNR Secretariat in defining the scope, type, and objectives of oversight assessments.
  • Prepare assessment agendas and support logistical planning as required.
  • Review background documentation prior to assessments, including previous oversight reports and ASP records.

Reporting and Follow-up

  • Identify, document, and grade nonconformities in accordance with GPSNR procedures.
  • Prepare clear, accurate, and well-justified oversight assessment reports.
  • Participate in opening and closing meetings with Assurance Service Providers.
  • Submit assessment reports to the GPSNR Secretariat for technical review within agreed timelines.
  • Support clarification or revision of reports where requested following technical review.

Professional and Ethical Requirements

  • Act in accordance with GPSNR assessment principles, including ethical conduct, impartiality, confidentiality, and due professional care.
  • Declare and manage conflicts of interest in line with GPSNR requirements.
  • Comply with all applicable health, safety, and confidentiality requirements during oversight activities.

Assessor Qualification and Competence Requirements

Proposals must demonstrate that the proposed Oversight Assessor(s) meet the following minimum requirements:

  • Relevant tertiary academic qualification in agriculture, environmental management, or a related field, or equivalent demonstrated professional experience.
  • At least three (3) years of professional experience in the management and/or delivery of certification or accreditation services.
  • Successful completion of a five-day ISO lead auditor training course based on ISO 19011.
  • Qualification as a lead auditor for the GPSNR programme or a comparable certification scheme in a related industry.
  • Successful completion (or commitment to complete) GPSNR-specific training on assurance procedures, assessment requirements, and relevant templates and tools.
  • Familiarity with GPSNR and the natural rubber industry

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or organisations with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must include understanding of the assignment and proposed approach, indicative schedule and availability as well as resumes of all key personnel performing the work.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate daily or hourly rates and an estimated number of days by activity.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 20th of February to be considered. Proposals should be submitted to natalie.low@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope of this RFP in order to get the most suitable consultant.
  8. Bidders must ensure that all external personnel involved in preparing and executing this proposal are under exclusive agreements specific to this RFP. These agreements must obligate the external personnel to exclusively dedicate their services to the bidder’s proposal, prohibiting their engagement in any other proposals for the same RFP. This measure is to maintain the integrity of the bidding process and prevent conflicts of interest.

Project Timelines

Proposals submitted by consultant to natalie.low@gpsnr.org

February 20, 2026

Selection of Top Bidders / Notification to Unsuccessful Bidders

February 27, 2026

Contract start date

Tentatively March 2026

Budget

The Platform invites consultants to submit a competitive price proposal, and the proposed budget will be factored into selection of the consultant. The total contract value shall be calculated based on the daily rate and actual number of days worked per month. Invoicing shall be submitted on a monthly basis and must include a breakdown of days worked and activities performed for the relevant period.

Evaluation Factors

GPSNR will rate proposals based on the following factors:

  1. Responsiveness to the requirements set forth in this Request for Proposal
  2. Relevant past performance/ experience
  3. Cost and overall value for money
  4. Technical expertise/experience of bidder/bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Note: The award of this contract will only be considered complete upon completion of the contract signing.

(CLOSED) Request for Proposal GPSNR REPORTING REQUIREMENTS (GPSNR-RFP-A02-013)

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR), is an international, multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers, smallholder rubber growers, and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define GPSNR strategies and objectives.

Through a process led by the Policy Toolbox and Implementation Guidance Working Group (WG1), the General Assembly approved a Policy Framework in September 2020 that outlines the specific commitments to sustainable natural rubber that GPSNR company members must include in their public policies or other relevant documents.  GPSNR ordinary member companies are required to create new or update existing policies to align with the Policy Framework by March 2021 (companies will have a possibility to request an extension provided they can demonstrate progress in developing or updating their policies).  A process is currently underway to develop Implementation Guidance for companies to deliver on their commitments as outlined in the Policy Framework.  Reporting Requirements (RRs) are also to be developed as part of the GPSNR assurance model (currently in draft form).  The RRs will vary depending on where a member company sits within the natural rubber supply chain, so this work will be organized by the following stakeholder categories:  1) natural rubber producers, processors and traders (this stakeholder category will develop RRs for growers, traders of raw materials, processors, traders of processed material) 2) tire makers and other natural rubber product manufacturers; and 3) auto makers and other end users. 

GPSNR seeks a fixed-term consultancy to facilitate the development of the RRs per the stakeholder category.  In 2020, WG1 drafted Baseline Reporting Requirements (BRRs) that were intended to offer a framework for companies to evaluate where they were on their sustainability journey.   Following on feedback from the Executive Committee (EC) in early 2021, the WG decided that the BRRs, with specific modifications, could be converted to become the first year RRs.  A necessary next step is to align the BRRs with other global reporting schemes that members report into, such as ZSL Spott, Global Reporting Initiative (GRI), CDP Forests, and Ecovadis.  The consultant will identify where GPSNR requirements are similar and will align wherever possible.  The Consultant will also specify the connection between specific reporting metrics and specific components of the policy framework.  The Consultant will work with the appropriate focus groups to further incorporate member feedback into the design of the RRs for each stakeholder category.  The consultant will also coordinate with the consultant(s) hired to facilitate the development of the Implementation Guidance to ensure alignment among the Implementation Guidance and RRs.

Once the focus groups approve the RRs, they will go to the broader WG1 for approval, then on to the EC for review/approval, and the General Assembly will vote to adopt the RRs in September 2021.

The Engagement

The Consultant is to develop draft RRs based on the Policy Framework, GPSNR BRRs and Implementation Guidance and through the review of existing reporting schemes (e.g., ZSL Spott, CDP Forests, GRI, Ecovadis) in an effort to seek alignment.

The Consultant will facilitate engagement with specific focus groups and the broader WG1 to further develop the RRs for the following categories:

  • Growers
  • Traders of raw material
  • Processors
  • Traders of processed material
  • Tire makers and other rubber product manufacturers, and
  • Car makers and other end users.

Terms

  • The engagement shall begin 22 March 2021 and the deliverables shall be delivered in their final form no later than 15 June 2021
    • Interim dates for draft submission and review shall be developed and mutually agreed upon with the Secretariat and WG1 Co-chairs at the time of the engagement.

  • The Consultant shall review relevant GPSNR documents (e.g, Policy Framework, draft assurance model design, BRRs, etc.) and conduct a series of interviews with members and other stakeholders to fill any information gaps and to develop a strong understanding of the priorities and needs of the Natural Rubber Industry and Supply Chain members.  This shall, of course, include examination of the opinions and realities of the smallholder growers as well as larger entities.

  • The consultant should have deep understanding and documented experience in:
    • Understanding of sustainability reporting initiatives, particularly those for other deforestation-risk commodities
    • Understanding of the natural rubber industry or other similar forest commodities
    • Understanding of multi-stakeholder initiatives for sustainability
    • Understanding of antitrust regulations and its relevance vis a vis multi stakeholder initiatives
    • Group facilitation/consultation processes

Tasks

  • Review GPSNR Policy Framework, Baseline Reporting Requirements and key sustainability reporting schemes to inform development of Reporting Requirements for each of the six stakeholder categories.
  • Facilitate consultation processes with relevant stakeholder focus groups to further flesh out Reporting Requirements.
  • Regular contact and updating of both the broader Working Group and its Co-chairs and the Secretariat will be required.

Necessary Competencies

GPSNR will award a contract to a consultant based on:

  1. The applicant’s level of experience and proven depth of knowledge on relevant sustainability frameworks/reporting schemes
  2. Value for money
  3. The Secretariat’s and Working Group Co-chairs’ assessment of the viability of the consultant’s ability to complete the deliverables to a high standard.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well
  3. A technical proposal must be provided that is not more than 3 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 page. This price proposal should indicate the overall fixed price for the project as well as daily rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to 12 March 2021 to be considered. Proposals should be submitted to aidan@gpsnr.org and stefano.savi@gpsnr.org for consideration.
  7. GPSNR anticipates shortlisting at least two individuals or firms with which to have more in-depth discussions and will make an award to one of these short-listed individuals or firms.
  8. Applicants can obtain a copy of the BRRs by sending a request to aidan@gpsnr.org
  9. GPSNR reserves the right to amend the scope of this RFP in order to get the most suitable consultant.

RFP & Project Timelines

The Request for Proposal timeline is as follows:

Proposal submitted by consultant to GPSNR   12/03/2021
Selection of Top Bidders /
Notification to Unsuccessful Bidders  
19/03/2021
Contract Award /
Notification to Unsuccessful Bidders  
22/03/2021
Work to commence no later than 29/03/2021
Need-date for project completion 15/06/2021

Budget

The Platform is anticipating that a total budget of no more than 10,000 Singapore Dollars (SGD) be allocated to this engagement.    
Payment terms shall be:

  • 20% at the signing of the contract
  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
  • 50% on delivery of the final report

Evaluation Factors

GPSNR will rate proposals based on the following factors:

  1. Responsiveness to the requirements set forth in this Request for Proposals
  2. Relevant past performance / experience and / or any samples of past work
  3. Cost, including an assessment of total cost of ownership.
  4. Technical expertise/experience of bidder and the bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Translate »
Scroll to Top