Request For Proposal – GPSNR-RFP-A02-030-Risk Taskforce Traceability Pilot Field Trial – Indonesia

Share This Post

Introduction & Background

 

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.

The Risk Subgroup of GPSNR is seeking a consultant/field team to identify, test, evaluate and report on what effort may be required for a rubber processor to map their supply shed (i.e., all the farms that they are sourcing from) in complex supply chains such as in Indonesia and Thailand. 

 

Objectives

The goal of the pilot is to investigate what effort (i.e., time, effort, cost, labour) may be required for a rubber processor to map their supply chain in complex supply chains such as Indonesia and Thailand.

The goal of this pilot is to map at least 300 small holder farmers supplying one processing mill each in Indonesia. The subgroup is open to negotiation on the total number of small holder farms mapped based on the service provider’s experience and estimation.

The service provider should work with the GPSNR Risk Subgroup and the participating processors from Indonesia and their dealers to:

  1. Keep track of time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each farm, and provide them to their GPSNR Point of Contact at the end of the survey.
  2. Register and map farmers using field-based mapping or in combination with remote sensing that is crossed checked with field-based mapping samples. The service provider is welcomed to use their own method.
    1. Collect and provide the shapefiles from the mapping at the end of the project to the point of contact and the participating processor.
  3. Ask farmers to answer the RubberWay questionnaire.
  4. Ask farmers to answer the HCVRN Nature Positive Farming questionnaire.
  5. Unless automatically uploaded, submit farmers’ responses to the respective databases and the GPSNR point of contact at the end of each day for compilation.
  6. Record the effort required to convince 300 farmers per processing mill to complete all 3 tools.
    1. Number of dealers and farmers contacted to identify 300 farmers willing to participate in study.
    2. Total person hours required to identify 300 willing suppliers.
    3. Details of incidental (not staff time) expenses required to identify 300 willing farmers.
  7. Record the effort required/difficulty to convince the super dealers/suppliers to participate in the study, based on the supplier tiers & on the pilot sample goal.
    1. Skip Tier 1 farms
    2. Not more than 100 responses from Tier 2
    3. 200 responses from Tier 3 and 4 suppliers

Scope of Work

  • Field data collection has to be completed by the second month from the starting date of the project.
    • Ideally, field teams are experienced in 2 or more of the above tools (RubberWay questionnaire, HCVRN Nature Positive Farming questionnaire and field-based or remote sensing-based mapping), else training will be provided. Please indicate which tools your team is experienced in using we will provide the necessary training.
      • If remote-sensing based is preferred by the service provider, please respond with the process and note that the data has to be cross-checked with field-based samples.
    • Field teams have to be able to speak the local language at each survey location(i.e., Bahasa Indonesia).
  • GPSNR estimates the necessary activities per farm and the time required to conduct them to be as follows:
  1. Explain purpose of visit (~15 mins)
  2. Get permission for personal data collection to ensure data protection (~5mins)
  3. Map farm via mapping based on the mapping method chosen by the service provider (e.g., field-based mapping or remote sensing cross-checked with field samples) (~90mins).
    1. Mapping for farms <4 hectares:
      1. Polygon mapping or GPS mapping is up to the discretion of the service provider.
    2. Polygon mapping for farms above 4 hectares:
      1. This is based on the EU regulation (see Annex A) that a polygon would be required for farmers over 4 hectares.
      2. At least 10% (~30 of the 300 farms must be polygon mapped)
    3. Fill in RubberWay questionnaire (~30mins)
    4. Fill in HCVRN Nature Positive Farming questionnaire (~30mins – 1 hour)
    5. Verify data before departure (~10mins)
  • GPSNR assumes:
    • Total time required: ~approximately 180 mins/3 hours per farm per field assistant.
    • Farms likely to be covered per day: 2 farms.
    • Total number of field assistant days required assuming 2 farms per day: 450 days
    • Total weeks required for 1 field assistant assuming 5 work days per week: 90 weeks
    • Total weeks required for two processors assuming 10 field assistants working simultaneously in one country: 9 weeks
    • This is an estimation of the time taken, we look forward to a comparison with the final recorded timings.
  • If you have other ideas on how to achieve the above objectives, please provide details about how you would design the study

Expected Deliverables

Specifically, GPSNR expects the consultant to:

 1. Map at least 300 farmers supplying to the participating processor in Indonesia and provide the shapefiles to the processor and the GPSNR point of contact.

a.      There should at least be 10% (~30 farms out of 300 farms) that are polygon mapped, based on the requirements mentioned above and in Annex A.

 2. We would like a detailed account of the time and resources spent on 1. travelling to the farm, 2. On the farm and 3. Data analysis

a.      We would like to see a breakdown of the total time spent in each component. E.g., Total reported time spent on 1 farm + 1 analysis = 8hours, within that 2 hour (time taken to travel to farm), 0.5 hours (convincing the farmer), 0.5 hours (communicating to farmer about the tool), 20 mins (Mapping the farms), 30 mins (HCVN questionnaire), 30 mins (Rubberway questionnaire)

 3. An evaluation of the merits and limitations of each tool

a.      E.g., 3/11 farmers surveyed were more apprehensive about the mapping tool due to fear of exposing their location.

 4. A recommendation of the scalability of this pilot

a.      Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

b.     E.g., $X/farm is calculated but is not scalable due to what reason(s).

Proposal Format and Contents

The proposal should include the following:

1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

2. The timeline and key stages of operations based on Project Timeline below

3. Budget, including detailed breakdown of expected manpower, logistics, and costs based on Budget below

4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

 

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 10 March 2023 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and cheryl@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Project Timelines

 

Proposals submitted by consultant to stefano.savi@gpsnr.org

10 March 2023

Selection of consultant /
Notification to Unsuccessful Bidders

16 March 2023

Contract Award / Notification to Unsuccessful Bidders

17 March 2023

Initial methodology presentation and Q&A with subgroup

23 March 2023

Training sessions for tools 

Late March – Early April 2023

Update session with subgroup 

April 2023

Final Draft report and conclusion of project 

July 2023

 

Budget

The Platform is anticipating that a total budget of no more than €25,000 be allocated to this engagement.

Payment terms shall be:

·        20% at the signing of the contract

·        30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan.

·        50% on delivery of the final report

The allocation of the payment shall be based on the net amount after travel
expenses, if deemed necessary by both the consultant and Secretariat, are
incurred and documented.

 

Evaluation Factors

 GPSNR will rate proposals based on the following factors, with cost being the most important factor:

1.        Responsiveness to the requirements set forth in this Request for Proposal

2.      Relevant past performance/ experience

3.      Samples of work

4.     Cost, including an assessment of total cost of ownership.

5.      Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

Annex

Annex A: EU Deforestation Regulation

‘geolocation’ means the geographical location of a plot of land described by means of latitude and longitude coordinates corresponding to at least one latitude and longitude point and using at least six decimal digits. For relevant commodities other than cattle, for plots of land of more than 4 hectares, the geographical location shall be provided using polygons, meaning sufficient latitude and longitude points to describe the perimeter of each plot of land.

Text obtained from Article 2: Definitions, point (29) of the Deforestation Regulation consolidated text dated 20/12/22Deforestation Regulation consolidated text 20-12-22

More To Explore

(Closed) Request For Proposal – GPSNR-RFP-A02-019 Guidance and Tools for GPSNR’s Reporting Requirements

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber producers and processors, vehicle makers and NGOs.

In December 2021, GPSNR members approved Reporting Requirements that would allow member companies to report on their progress implementing their commitments under the Policy Framework. With the approval of the reporting requirements, ordinary member companies shall report annually on the questions included in the Reporting Requirements for the member’s reporting category.

GPSNR members are required to submit data for the previous year according to the following reporting timelines:
• Category A and Category B: Industrial Producers or Processors and Traders of Raw Materials: on or before 30 June
• Category C: Manufacturers and Traders of Processed Material: on or before 30 September
• Category D: OEMs and End Users: on or before 31 December.

To support GPSNR members in fulfilling their obligations under the Reporting Requirements, the platform is calling for consultants to develop a systemic view of the reporting process, inclusive of developing supporting documents and reporting templates for members to facilitate reporting, and exploring the potential user interface and portal design for data submission to ease the integration and consolidation of reported information from various GPSNR member categories.

Reporting scope and materiality are topics for consultant’s review and suggestion based on the GPSNR reporting requirement.

The reporting process should cover the following scenarios (non-exhaustive list):
(i) tier-1 supplier is disclosed to GPSNR
(ii) tier-1 supplier is not disclosed to GPSNR
(iii) members with suppliers across different category groups that are not GPSNR members
(iv) members with external reports that may substantiate the GPSNR reporting requirement
(v) how the information is consolidated at GPSNR level at the end of each category reporting cycle

Figure below is taking one example of tire maker category member reporting on NR supply chain scope to illustrate the potential complexity of the reporting process.

The expected documents to be developed should include:

  • A guidance document for each reporting category outlining the appropriate methodology and reporting format for each question, with reference to necessary definitions. One example of reporting segment that requires guidance is Policy Component 2.5 and 2.6 for member categories C and D.
  • Standardized reporting templates which may utilize word documents, excel spreadsheets, or other appropriate reporting formats.

The documents developed should ensure that data can be consolidated easily across the supply chain with an understanding that the information will be passed downstream. Where appropriate, the requested data should align with data gathered by other reporting schemes to reduce the reporting burden (including, but not limited to, CDP, Ecovadis, ZSL SPOTT, GRI, FSC, PEFC, SNR-i).

The reporting user interface which includes ability for member to upload supporting evidence (e.g., documents, photos etc) and portal design should also enable easy intake by the Secretariat for data analysis, verification and reporting. The ability to design integration with Salesforce is a plus.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that should be around 6 pages in length. This technical proposal must provide an overview of the proposed methodology as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 page. This price proposal should indicate the overall fixed price for the project as well as daily rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to 14th of March to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration.
  7. GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with, and will make an award to one of these “down-selected” individuals or firms.


Project Timelines

The Request for Proposal timeline is as follows:

Request for Proposal Issuance   4 Mar 2022
Proposal submitted by consultant to stefano.savi@gpsnr.org   14 Mar 2022
Selection of Consultant /
Notification to Unsuccessful Bidders
18 Mar 2022
Contract Award 22 Mar 2022
Work to commence no later than   23 Mar 2022
Specific work-plan agreed upon with GPSNR’s Policy Toolbox Working Group (WG1) 24 Mar 2022
1st deliverable: first draft of guidance on GPSNR Reporting Requirement content and reporting template for PPTs (category A & B), both GPSNR and non-GPSNR. 18 Apr
2022
Final draft of guidance on content for PPTs 25 Apr 2022
2nd deliverable: first draft of guidance on GPSNR Reporting Requirement and reporting template for category C & D, both GPSNR and non-GPSNR. 13 May 2022
Final draft of guidance on content for category C & D 20 May 2022
3rd deliverable: first draft proposal for a streamline reporting process, user interface and portal design to integrate and consolidate the reporting information from all GPSNR member categories 24 Jun
2022
The final draft proposal submitted to WG1 7 Jul 2022

Budget

The Platform is anticipating that a total budget of no more than 30,000 SGD. If the consultant deems that travel plans are required to execute this project, these should be included in the proposal (along with any additional budgetary requirements).

Payment terms shall be:

●       20% at the signing of the contract
●       30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
●       50% on delivery of the final report

Evaluation Factors

GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  1. Cost
  2. Responsiveness to the requirements set forth in this Request for Proposals
  3. Relevant past performance/experience
  4. Technical expertise/experience of bidder and bidder’s staff
  5. The ability to collect relevant information at the global and local level

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Request for Proposal – Third-Party Oversight Body for the GPSNR Assurance System

NOVEMBER 2026

ISSUED BY
Global Platform for Sustainable Natural Rubber

REPRESENTATIVE
Aidan Mock
aidan@gpsnr.org

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

GPSNR’s Assurance System supports members in implementing the commitments made under the GPSNR Policy Framework. Under the GPSNR Assessment Procedure (version 1.0, 31 July 2025), all ordinary company members are subject to an annual independent assessment of conformity with GPSNR requirements. Assessments start in the third year of membership, or in 2027 for members that joined before 2025.

Assessments are carried out by Assessment Service Providers (ASPs) that GPSNR has approved and that have completed GPSNR training. Each assessment report is technically reviewed and signed off by the GPSNR Secretariat. The Secretariat also monitors ASP performance and handles complaints and appeals under the GPSNR Complaint and Appeal Management procedure.

The Assessment Procedure and the ASP Agreement allow the Secretariat to outsource ASP due diligence, monitoring and evaluation, and related oversight activities to a qualified and competent independent third-party oversight body. This RFP invites proposals from organisations that can take on that role.

The following documents are provided with this RFP as reference. They describe the duties and expectations the oversight body will work within:

  • GPSNR Assessment Checklist, version 1.0
  • GPSNR Assessment Procedure, version 1.0

The Engagement

The GPSNR Secretariat is seeking an independent third-party oversight body (individuals or firms may apply) for a two-year contract, starting on contract signing in March 2027. The oversight body will support the Secretariat in checking the quality and consistency of GPSNR assessments and the competence of the ASPs that carry them out.

The work is divided into six modules. Bidders must quote each module separately so that GPSNR can add or remove modules according to the budget available. Quotes must not depend on other modules being awarded.

Module 1: Technical review of assessment reports

Indicative effort: 50-60 reports (estimated 20 days) per contract year.

Review each assessment report submitted by an ASP against the criteria in section 6.8 of the Assessment Procedure. The review checks that:

  • all sections of the GPSNR report template are completed;
  • evidence, documented procedures and records checked during the assessment are recorded;
  • conformity with GPSNR requirements is adequately assessed, and the assessment followed the Assessment Procedure;
  • findings are supported by evidence, are consistent with the report, and are graded in line with GPSNR grading requirements.

The oversight body will also review written comments submitted by members on their assessments. Where a report is unclear or incomplete, the oversight body will prepare clarification requests for the ASP through the Secretariat. For each report, the oversight body will give the Secretariat a written review outcome and recommendation within the timeline set in the Assessment Procedure (currently 10 calendar days from submission of the report). Final sign-off remains with the Secretariat. The base expectation is 50 to 60 reports to be reviewed every year. The indicative 20 days is the Secretariat’s own calculation based on that volume. Report volumes are expected to peak in the recommended assessment windows (processors and producers: January to March, manufacturers: May to August, end users: October to December).

Bidders should indicate the estimated time required per report review, including any assumptions regarding report complexity, clarification requests and follow-up reviews. Bidders should also explain how they will maintain the required turnaround times during periods of high assessment volume.

The following documents are provided to support bidders in understanding the GPSNR Assurance System requirements and preparing their technical and financial proposals.

Bidders are encouraged to review these documents when developing their proposed methodology, resource allocation, estimated level of effort and pricing.

Module 2: Calibration training for ASPs

Indicative effort: 10 days per contract year, covering two calibration sessions per year.

Design and deliver calibration training for approved ASPs so that the checklist, grading of findings and report writing are applied consistently. Content should draw on the findings from Module 1. The oversight body will provide training materials, deliver the sessions, record attendance, check participants’ understanding, and report the results to the Secretariat. The training builds on the official GPSNR assessor training program, which the Secretariat prepares and owns.

Module 3: Process improvement proposals

Indicative effort: 5 days per contract year.

Use the results of the technical reviews, ASP monitoring, member comments, complaints and appeals to propose practical improvements to the Assurance System. This may cover the Assessment Procedure, the Assessment Checklist, the report template, grading rules and training. Each year the oversight body will deliver a short written proposal with the evidence behind each recommendation and a suggested priority. Decisions on changes rest with the Secretariat and the General Assembly.

Module 4: ASP qualification and monitoring

Indicative effort: about 3 to 5 days of work per ASP review process, including the witness or monitoring assessment. The figure below provides an overview of the ASP approval and monitoring process, including initial qualification, approval and ongoing oversight activities. 

Expected number of ASP review processes per contract year: 5 to 8 assessments. The effort required may vary depending on whether the review involves desk assessments, office assessments, witness assessments, follow-up verification or ongoing monitoring.

Carry out the ASP qualification and monitoring activities described in the Assessment Procedure and the ASP Agreement, for each ASP review process:

  • review of ASP applications and due diligence (legal status, ability to operate in the relevant countries, impartiality and conflict of interest procedures, confidentiality, insurance, relevant experience, competent resources, and public incident and background checks);
  • initial approval assessments, including desk reviews, office assessments and witness assessments, which may be done remotely;
  • annual monitoring of ASPs that carried out GPSNR assessments, using the results of report reviews, member comments, grievances, appeals and stakeholder complaints;
  • evaluation of evidence that may trigger suspension, and review of corrective action plans for reinstatement;
  • an annual report on ASP performance for the Secretariat, to be presented to the GPSNR Executive Committee.

Final decisions on ASP approval, suspension and reinstatement remain with the Secretariat unless GPSNR decides in writing to delegate them.

Module 5: ISEAL gap analysis and follow-up

Bidders propose the effort and timeline for each part.

Part A: gap analysis. Carry out a gap analysis of the GPSNR Assurance System against the whole ISEAL Code of Good Practice for Sustainability Systems (version 1.1, or the version current at contract signing). The deliverables are a draft and a final report showing, for each requirement, the current level of conformity, the evidence reviewed, and a prioritised action plan to close the gaps.

Part B: follow-up on gaps. In the second contract year, review the progress made by GPSNR in closing the gaps identified in Part A. The deliverable is a written report on the status of each gap, the evidence of closure, and the remaining actions.

Module 6: Complaint and appeal investigations

As needed. Billed on the bidder’s day rate, for the days worked.

When the Secretariat decides that an independent party should investigate a complaint about an ASP or an appeal by an ASP, the oversight body will carry out the investigation under the GPSNR Complaint and Appeal Management procedure. The Secretariat will agree the scope with the oversight body before each case starts. An investigation may include a review of the documents and evidence, interviews of the parties involved, and, where needed, a field assessment. The oversight body will update the Secretariat after each stage and deliver a written recommendation (for a complaint, with a corrective action plan where required). Individuals with a conflict of interest must not take part. Decisions remain with the Secretariat.

Requirements that apply to all modules

  • Independence. The bidder and its staff must not provide assessment, consulting or advisory services to GPSNR members or ASPs in connection with GPSNR during the contract. Bidders must disclose any actual, potential or perceived conflict of interest in their proposal, and notify GPSNR of any change during the contract.
  • Confidentiality and competition law. Reports contain commercially sensitive information, such as sourcing and supplier details. This information must not be shared between members or between ASPs, and must be handled in line with the Assessment Procedure, a non-disclosure agreement with GPSNR, and applicable competition law.
  • Personal data. The bidder must comply with the Singapore Personal Data Protection Act 2012 and, where applicable, the EU GDPR, and must return or delete personal data at the end of the contract.
  • Reporting. A short progress report each quarter and a meeting with the Secretariat at least once a quarter. These costs are to be included in the module prices.
  • Operational tracking. The oversight body shall maintain an up-to-date record of ongoing ASP qualification and monitoring activities, including assessment status, outstanding findings, agreed actions, responsible parties and expected completion dates. This information shall be made available to the Secretariat to support coordination and follow-up.
  • Onboarding. At the start of the contract, the oversight body shall review existing ASP qualification and monitoring records, outstanding findings, ongoing assessment activities and relevant Secretariat procedures. The oversight body shall work with the Secretariat to ensure continuity of oversight activities during the beginning of the contract.
  • Handover. At the end of the contract the bidder will hand over all records, review files and ASP monitoring documents to the Secretariat.

Proposal Format and Contents

The proposal should include the following:

  1. Workplan that outlines a timeline and key stages of work for each module, with a focus on how the bidder will meet review turnaround times during the peak assessment windows. The workplan should also describe the bidder’s approach to coordinating assessment activities with the Secretariat, managing outstanding findings, maintaining continuity during the transition period and escalating urgent issues or delays
  2. Budget with a separate quote for each module (see the Budget section).
  3. Description of past work and technical expertise relevant to this RFP, including oversight or technical review of audit or assessment reports, ASP or auditor qualification and monitoring, and experience with ISEAL requirements.
  4. List of project team members with their roles in the project, associated qualifications and languages.
  5. Statement of independence and declaration of any conflicts of interest.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 6 pages.  This technical proposal must provide an overview of the proposed approach for each module, a proposed schedule and milestones, and the bidder’s independence statement. Resumes of all key personnel may be attached in addition to the 6 pages. Concision is requested and shall be recognized in the selection of the final proposal.
  4. A price proposal must be provided that is not more than 1 page. This price proposal must show a separate quote for each of the modules, as set out in the Budget section.
  5. Proposals must be signed by a representative that is authorized to commit the bidder’s company.
  6. Proposals must be received by 31 January 2027 to be considered. Proposals should be submitted to aidan@gpsnr.org for consideration.
  7. GPSNR will award the contract to a single bidder. GPSNR reserves the right to contract all or only some of the modules from that bidder, and to amend the scope and budget of this RFP in order to get the most suitable provider.
  8. Bidders must ensure that all external personnel involved in preparing and executing this proposal are under exclusive agreements specific to this RFP. These agreements must obligate the external personnel to exclusively dedicate their services to the bidder’s proposal, prohibiting their engagement in any other proposals for the same RFP. This measure is to maintain the integrity of the bidding process and prevent conflicts of interest.
  9. Award of this contract is subject to confirmation of financing from GPSNR members.

Project Timelines

Activity

Date

RFP issued and application period opens

10 November 2026

Application period closes. Proposals submitted by bidders to aidan@gpsnr.org

15 January 2027

Review and evaluation of proposals by GPSNR, including any clarification questions to bidders

February 2027

Contract award and signing

March 2027

Contract term

24 months from signing

Modules 1 to 4 activities

Throughout the contract term

Module 5 Part A: draft and final ISEAL gap analysis

Timeline to be proposed by bidders

Module 5 Part B: follow-up on ISEAL gaps

Second contract year

Module 6: complaint and appeal investigations

As needed during the contract term

Budget

The Platform invites bidders to submit a competitive price proposal. The proposed budget will be factored into the selection of the oversight body.

Please quote each module separately, in USD and excluding taxes. Where a fixed price applies, give the daily rate, the number of days and the fixed total, for each contract year. Show travel and expenses separately, if any. The table below sets out the indicative effort and what we need from you.

Module

Indicative effort

Quote required

1. Technical review of reports

20 days per contract year (50 to 60 reports)

Daily rate, days and fixed total per contract year

2. Calibration training (2 sessions per year)

10 days per contract year

Daily rate, days and fixed total per contract year

3. Process improvement proposals

5 days per contract year

Daily rate, days and fixed total per contract year

4. Assessor qualification and monitoring

3 to 5 days per ASP review, including the witness assessment

Daily rate, days and fixed price per ASP review

5A. ISEAL gap analysis

To be proposed by bidder

Daily rate, days and fixed total

5B. Follow-up on ISEAL gaps

To be proposed by bidder

Daily rate, days and fixed total

6. Complaint and appeal investigations

As needed

Daily rate only

Bidders may propose a different number of days for a module, with a short justification. Each module must be priced on its own. A discount for awarding several modules together may be offered as a separate line. GPSNR may add or remove modules at award and at the start of each contract year, at the quoted prices.

Please provide a daily rate, a single rate is fine. It will be used to bill Module 6 and any additional work that GPSNR requests under a separately agreed scope.

Payment terms shall be:

  • Module 1: quarterly in arrears, for reviews completed and accepted by the Secretariat, up to the quoted total
  • Module 2: after each calibration session is delivered and the session report is accepted by the Secretariat
  • Module 3: on delivery and acceptance by the Secretariat of the annual proposal
  • Module 4: on completion of each review process for an ASP, as accepted by the Secretariat
  • Module 5 Part A: 20% upon commencement of work, 30% on delivery of the draft gap analysis, and 50% on delivery of the final gap analysis
  • Module 5 Part B: on delivery and acceptance by the Secretariat of the follow-up report
  • Module 6: on completion of each case, for the days worked at the quoted daily rate

Evaluation Factors

GPSNR will rate proposals based on the following factors, in no particular order:

  1. Responsiveness to the requirements set forth in this Request for Proposal, including the ability to be concise and communicate effectively.
  2. Relevant past performance with oversight of assurance systems, technical review of assessment reports and ASP monitoring, including samples of work
  3. Cost, including the clarity and fairness of the module quotes
  4. Technical expertise of the bidder and its staff, including knowledge of ISEAL requirements and, as an advantage, the natural rubber sector
  5. Independence and management of conflicts of interest
  6. Proposed timeline and capacity to meet turnaround times in peak assessment windows. Demonstrated ability to manage fluctuating assessment volumes, coordinate multi-country oversight activities, and provide timely technical recommendations within the required deadlines.

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Note: The award of this contract will only be considered complete upon securing full funding and completion of the contract signing.

Other notes

Any questions or requests for documents can be addressed to aidan@gpsnr.org and soma@gpsnr.org.

 