JOINT LETTER FROM GPSNR AND ETRMA TO MEMBERS OF EUROPEAN PARLIAMENT ON THE PROPOSED EXTENSION OF THE EUDR

Share This Post

Along with the European Tire and Rubber Manufacturers Association, GPSNR wrote to the European Parliament in early November 2024 to ask MEPs to help create certainty about the implementation timeline of the European Union Deforestation Regulation and not re-open the regulatory text. 

More To Explore

News

GPSNR Working Groups Update: May 2023

Strategy and Objectives Working Group: The consortium of Agridence and Koltiva have initiated field trials for the Risk Subgroup Traceability Pilot. The Risk Subgroup is also planning the next steps for the deliverable from ASI regarding the Risk Assessment Framework, including internal piloting and cross-walking with GPSNR commissioned studies to identify any gaps. 

Additionally, the Risk Subgroup and Basel Institution are in preliminary discussions for a potential collaboration to investigate corruption risk in the supply chain. The Assurance Model Task force will convene to receive updates on KPI alignments, the due diligence system, and the progress model of its members.

Smallholders Representation and Capacity Building (SCB) Working Group: The SCB WG has formally endorsed the Terms of Reference (TORs) on April 27, and the Smallholders Policy-Equivalent (SPE) Taskforce is currently working towards securing the SCB WG’s endorsement for the final recommendations presented in their report.

The Thailand National Subgroup recently announced a tender for GAP Coaching on May 4, with a proposal submission deadline of June 30, 2023. Meanwhile, the Agroforestry-Income Diversification Taskforce is working on finalising the workshop schedule for the years 2023-2024. Lastly, the SCB WG will continue to oversee all projects taking place in Indonesia and Thailand.

 Policy Toolbox Working Group: The working group has chosen consultant Petra Westerlaan to propose a quantitative approach for the reporting matrix, including a crosswalk with other reporting frameworks (CDP Forest, GRI, and ZSL-SPOTT), aiming to facilitate data aggregation and simplify the evaluation of annual progress. They will evaluate and decide on the consultant’s proposed revisions to the reporting framework, and make recommendations to improve the reporting process and timelines.

The Policy Toolbox WG has to agree on the TRR, update Reporting Guidance to reflect the proposed changes, and finalize the Compliance Panel TOR and operational guidance based on the Assurance Model. The WG is currently conducting meetings that will continue during the in-person meetings. 

Shared Responsibility Working Group: The face-to-face meeting included a presentation on governance and guiding principles, and manufacturers to submit a revised document. The WG is currently awaiting the outcomes of discussions on shared investment principles at the manufacturers’ category level before proceeding with their work. Once the proposal from the manufacturers is available, the WG will revamp the discussions on data sharing and value transfer.

News

Developing a GPSNR Assurance Model

Assurance is defined as demonstrable evidence that specified requirements relating to a product, process, system, person or body are fulfilled. In other words, thinking about Assurance is to ponder the question: how do we protect the credibility of our claim?

The Executive Committee (EC) has been working on an Assurance model concept since late 2019. Following the request for proposal put up in August 2019, an external consultant was engaged to conduct a review of the options for various Assurance Models that would support the desired outcomes of the Platform. In early 2020, the report from the consultant, which discussed existing approaches to Assurance and included recommendations for GPSNR’s approach to Assurance, was submitted to the EC. 

The EC considered the input from the report and expanded upon its findings by conducting a thorough benchmarking of existing Assurance model approaches. Following this exercise, the EC identified and defined several key characteristics that merit inclusion in GPSNR’s Assurance model concept.

In the process of developing these key characteristics, the EC also took into account the purpose, value and benefits of an Assurance model. 

A robust Assurance model would provide a credible and effective system to manage risks by supporting the achievement of sustainability impacts, focusing on accurate assessments of compliance, ensuring the effectiveness of its assurance strategies through good information management systems, and finding additional ways to create value for stakeholders.

A webinar will be held on Friday, 26 June 2020 to introduce GPSNR members to a proposed Assurance model concept.

A tabled summary of the process and timelines around the development of the Assurance model concept up until now is included below:

January 2020 Consultant report submitted to EC for review
January – February 2020 EC discussions
March 2020 Deep dive into Assurance model benchmark by EC sub-group
April 2020 EC agrees on basic characteristics to build Assurance model from
April – June 2020 Design, discussion and refinement within EC

Scroll to Top