Request For Proposal – GPSNR-RFP-C03-034-Polygon Mapping Malaysia

Share This Post

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. 

 

The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only.  The SG is seeking a consultant/field to map their supply shed (i.e., all the farms that they are sourcing from) focusing on polygon mapping techniques in complex supply chains such as in Indonesia, Malaysia and Thailand – each with a separate RFP, and report on the price and time required for each polygon mapped.

Objectives

The goal of the project is to investigate what effort (i.e., time and cost) may be required for a rubber processor to map their supply chain in complex supply chains in Malaysia

The consultant is to map small holder farmers in selected regions within Malaysia. Manufacturers will specify the regions to be mapped at a later date. 

The service provider should work with the Manufacturer’s Subgroup and the participating processors from Malaysia and their dealers to:

 

  1. Keep track of the time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each polygon, and provide them to their GPSNR Point of Contact at the end of the survey.

  2. Register farmers using a provided data logger application. The service provider is welcomed to use their own data logger application. 

 

Scope of Work/Expected Deliverables

Specifically, GPSNR expects the consultant to:

  1. Map regions of rubber producers supplying to the participating processor in Malaysia via polygon mapping. 

    1. Single GPS coordinates should not be utilised irrespective of the size of the plantation. 

    2. Geo mapping to include coordinates up to 6 decimal places in geoJSON format 

    1. Store/transfer geo location polygons mapped, to a 3rd party database as designated. 

    2. Bi-weekly progress reports 

    3. Ensure compliance to applicable local and global data privacy norms and regulations such as but not limited to GDPR, PDPA, etc.

  1. We would like a detailed account of the resources: 

    1. Price per polygon mapped – Cost per unit (per Farmer/Plot/Polygon) 

    2. Timeline to map Polygons per day (eg 18 months to map X polygons)

  1. A recommendation of the scalability of this pilot

    1. Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

    2. E.g., $X/farm is calculated but is not scalable due to what reason(s).

  2. Interested parties should submit the quote for the following – 

    1. For mapping polygons (cost per Ha)

    2. For mapping polygons + completing set of questionnaires as a part of risk assessment

  3. Comply with applicable data privacy norms and regulations (including but not limited to GDPR and PDPA).

  4. An optional activity that service providers could provide is the ability to integrate a transactional traceability function (own or 3rd party as designated)

Proposal Format and Contents

The proposal should include the following:

 

  1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

  2. The timeline and key stages of operations based on Project Timeline below 

  3. Budget, including detailed breakdown of expected manpower, logistics, and costs as mentioned above

  4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

Submission Guidelines & Requirements 

The following submission guidelines & requirements apply to this Request for Proposal: 

 

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project. 

  2. Examples of previous relevant work should be provided. 

  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable. 

  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days. 

  5. Proposals must be signed by a representative that is authorized to commit bidder’s company. 

  6. Proposals must be received prior to the 25th of September to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration. 

  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic. 

Project Timelines

 

RFP Published

4 Sep 2023

Proposal Submission Deadline

25 Sep 2023

Contract Awarded

9 Oct 2023

Initial methodology presentation and Q&A with subgroup

23 Oct 2023

Bi-weekly progress updates

23 Oct till project conclusion

Other milestones to be agreed upon during initial Q&A

 

 

Budget

The Platform is anticipating that a total budget of no more than 20USD/ha be allocated to this engagement and more competitive quotations will be favoured. 

 

Payment terms shall be:

  • 20% at the signing of the contract

  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan

  • 50% to be agreed based on mutually agreed milestones

The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.

Evaluation Factors

GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  1. Responsiveness to the requirements set forth in this Request for Proposal

  2. Relevant past performance/ experience

  3. Samples of work

  4. Cost, including an assessment of total cost of ownership

  5. Technical expertise/experience of bidder and bidder’s staff

 

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

More To Explore

Tender

(CLOSED) Request for Proposal – GPSNR Baseline reporting requirements pilot

The Global Platform for Sustainable Natural Rubber (GPSNR), is an international multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define GPSNR strategy and objectives.

GPSNR’s Policy Toolbox Working Group is developing for approval two key documents that will form GPSNR member requirements. First is a set of Policy Components, which outlines specific commitments that GPSNR company members should include in their sustainable natural rubber policies. Second are the Baseline Reporting Requirements, which indicates qualitative and quantitative sustainability data to be reported to the GPSNR Secretariat for year 1 (2020). To finalize these Baseline Reporting Requirements, the Working Group is conducting a pilot test with volunteer companies. The aim of the pilot is to understand any constraints companies may have in obtaining or sharing certain information, with the goal to refine and finalize the Baseline Reporting Requirements based on company feedback.

In order to achieve this, GPSNR is seeking a fixed term consultancy firm who will be responsible for gathering the responses from pilot participants, ensuring data security and confidentiality, and providing a short aggregated summary of data, including recommendations to GPSNR to inform the revision of the reporting requirements and questionnaire.

Scope of Engagement

The consultancy firm shall provide:

A system to collect data that must:

  1. Provide a secure and unique login for pilot participants to access data submission form  
  2. Ensure data security during transmission and storage of data (as some data will have commercial sensitivity)
  3. Possess, at minimum, the following:
    Ability to export data collected into CSV, XML or PDF formats for data analysis
    Salesforce integration
    Ability to accept file attachments
  4. Allow pilot participants to identify the preferred type of disclosure for each data point, according to the following categories:
    Public Disclosure
    Disclose only to GPSNR Secretariat
    Disclose only to consultant (for aggregate reporting)
    Not for disclosure

A review of all data received, including:

  1. A summary of aggregate data as reported, with highlights of any major anomalies in answers
  2. A short report for internal GPSNR use (Secretariat and members), aimed at informing GPSNR in the revision of the questionnaire/ process

The consultancy firm might be required to conduct limited interviews with pilot participants (if necessary) around the sensitive data (to be quoted separately as addendum based on hourly cost).

GPSNR Secretariat will be able to assist in certain areas of the project, including development of an online submission form, if necessary. For a detailed list of the support from GPSNR, see page 6.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from firms or organisations with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 3 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to 26 June to be considered. Proposals should be submitted to stefano.savi@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

(CLOSED) Request for Proposal – Grievance Mechanism Review

The Global Platform for Sustainable Natural Rubber is an international, Multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOS of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

Through GPSNR’s Working Groups and the Executive Committee, the Platform is developing an Assurance Model that is intended to be credible and smoothly functioning. Underlying this Assurance Model, and to ensure its effective implementation, is the need for a mechanism by which Members and non-members may take grievances they have against a Member for non-conformance with the Platform’s requirements, which may arise from non-conformance with standards, the Code of Conduct, Conflict of Interest Policy, or other requirements of Members and allow those complainants to have their grievance be heard and resolved (“Grievance Mechanism”).

Under its authority and duty to create a Compliance System for the Platform under Section 10.d. of the Platform’s statutes, the Executive Committee seeks recommendations on the organization and process for such a Grievance Mechanism that allows for the intake, an initial, professionally mediated resolution process, and, finally, the process by which it is submitted to a formal Complaints Panel for resolution in the case that mediation does not work. That recommendation would be in accordance with the engagement outline below and based on a comparative study of best practices in grievance mechanisms for similar multi-stakeholder initiatives.

Understanding that the Platform is in its early stages, and therefore has limited resources, the recommendation should strive for a lean model while maintaining consistency with the policies of the Platform (e.g., Conflict of Interest Policy). Although lean, the Platform also recognizes the need for a process that is accessible, impartial, timely, transparent, and affords protections, such as anonymity, to the complainant (where needed). Developing the Grievance Mechanism is expected to be an iterative process.

The consultant is to develop, in consultation with the GPSNR Executive Committee and Secretariat, a Grievance Mechanism in the form of a process flowchart and a set of rules governing the process for receiving, assessing, processing, and escalating grievances through a series of steps to find an agreeable and just solution. The consultant should adhere to the following phased, iterative approach:

  • Phase I – Comparative Review of Grievance Mechanisms for Similar Multi-Stakeholder Initiatives
  • Phase II – Process Flowchart/Outline
  • Phase III – Final Recommendation

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 13th of December to be considered. Proposals should be submitted to stefano.savi@gpsnr.org for consideration.
  7. GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with and will make an award to one of these “down-selected” individuals or firms.
  8. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Download full Request for Proposal here

Attachement A -will be shared upon submission

Attachement B- will be shared upon submission

Scroll to Top