Request For Proposal – GPSNR-RFP-C03-034-Polygon Mapping Malaysia

Share This Post

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. 

 

The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only.  The SG is seeking a consultant/field to map their supply shed (i.e., all the farms that they are sourcing from) focusing on polygon mapping techniques in complex supply chains such as in Indonesia, Malaysia and Thailand – each with a separate RFP, and report on the price and time required for each polygon mapped.

Objectives

The goal of the project is to investigate what effort (i.e., time and cost) may be required for a rubber processor to map their supply chain in complex supply chains in Malaysia

The consultant is to map small holder farmers in selected regions within Malaysia. Manufacturers will specify the regions to be mapped at a later date. 

The service provider should work with the Manufacturer’s Subgroup and the participating processors from Malaysia and their dealers to:

 

  1. Keep track of the time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each polygon, and provide them to their GPSNR Point of Contact at the end of the survey.

  2. Register farmers using a provided data logger application. The service provider is welcomed to use their own data logger application. 

 

Scope of Work/Expected Deliverables

Specifically, GPSNR expects the consultant to:

  1. Map regions of rubber producers supplying to the participating processor in Malaysia via polygon mapping. 

    1. Single GPS coordinates should not be utilised irrespective of the size of the plantation. 

    2. Geo mapping to include coordinates up to 6 decimal places in geoJSON format 

    1. Store/transfer geo location polygons mapped, to a 3rd party database as designated. 

    2. Bi-weekly progress reports 

    3. Ensure compliance to applicable local and global data privacy norms and regulations such as but not limited to GDPR, PDPA, etc.

  1. We would like a detailed account of the resources: 

    1. Price per polygon mapped – Cost per unit (per Farmer/Plot/Polygon) 

    2. Timeline to map Polygons per day (eg 18 months to map X polygons)

  1. A recommendation of the scalability of this pilot

    1. Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

    2. E.g., $X/farm is calculated but is not scalable due to what reason(s).

  2. Interested parties should submit the quote for the following – 

    1. For mapping polygons (cost per Ha)

    2. For mapping polygons + completing set of questionnaires as a part of risk assessment

  3. Comply with applicable data privacy norms and regulations (including but not limited to GDPR and PDPA).

  4. An optional activity that service providers could provide is the ability to integrate a transactional traceability function (own or 3rd party as designated)

Proposal Format and Contents

The proposal should include the following:

 

  1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

  2. The timeline and key stages of operations based on Project Timeline below 

  3. Budget, including detailed breakdown of expected manpower, logistics, and costs as mentioned above

  4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

Submission Guidelines & Requirements 

The following submission guidelines & requirements apply to this Request for Proposal: 

 

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project. 

  2. Examples of previous relevant work should be provided. 

  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable. 

  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days. 

  5. Proposals must be signed by a representative that is authorized to commit bidder’s company. 

  6. Proposals must be received prior to the 25th of September to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration. 

  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic. 

Project Timelines

 

RFP Published

4 Sep 2023

Proposal Submission Deadline

25 Sep 2023

Contract Awarded

9 Oct 2023

Initial methodology presentation and Q&A with subgroup

23 Oct 2023

Bi-weekly progress updates

23 Oct till project conclusion

Other milestones to be agreed upon during initial Q&A

 

 

Budget

The Platform is anticipating that a total budget of no more than 20USD/ha be allocated to this engagement and more competitive quotations will be favoured. 

 

Payment terms shall be:

  • 20% at the signing of the contract

  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan

  • 50% to be agreed based on mutually agreed milestones

The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.

Evaluation Factors

GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  1. Responsiveness to the requirements set forth in this Request for Proposal

  2. Relevant past performance/ experience

  3. Samples of work

  4. Cost, including an assessment of total cost of ownership

  5. Technical expertise/experience of bidder and bidder’s staff

 

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

More To Explore

Request For Proposal – GPSNR-RFP-A02-029-Risk Taskforce Traceability Pilot Field Trial – Thailand

Introduction & Background

 

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.

The Risk Subgroup of GPSNR is seeking a consultant/field team to identify, test, evaluate and report on what effort may be required for a rubber processor to map their supply shed (i.e., all the farms that they are sourcing from) in complex supply chains such as in Indonesia and Thailand. 

 

Objectives

The goal of the pilot is to investigate what effort (i.e., time, effort, cost, labour) may be required for a rubber processor to map their supply chain in complex supply chains such as Indonesia and Thailand.

The goal of this pilot is to map at least 300 small holder farmers supplying one processing mill each in Thailand. The subgroup is open to negotiation on the total number of small holder farms mapped based on the service provider’s experience and estimation.

The service provider should work with the GPSNR Risk Subgroup and the participating processors from Thailand and their dealers to:

  1. Keep track of time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each farm, and provide them to their GPSNR Point of Contact at the end of the survey.
  2. Register and map farmers using field-based mapping or in combination with remote sensing that is crossed checked with field-based mapping samples. The service provider is welcomed to use their own method.
    1. Collect and provide the shapefiles from the mapping at the end of the project to the point of contact and the participating processor.
  3. Ask farmers to answer the RubberWay questionnaire.
  4. Ask farmers to answer the HCVRN Nature Positive Farming questionnaire.
  5. Unless automatically uploaded, submit farmers’ responses to the respective databases and the GPSNR point of contact at the end of each day for compilation.
  6. Record the effort required to convince 300 farmers per processing mill to complete all 3 tools.
    1. Number of dealers and farmers contacted to identify 300 farmers willing to participate in study.
    2. Total person hours required to identify 300 willing suppliers.
    3. Details of incidental (not staff time) expenses required to identify 300 willing farmers.
  7. Record the effort required/difficulty to convince the super dealers/suppliers to participate in the study, based on the supplier tiers & on the pilot sample goal.
    1. Skip Tier 1 farms
    2. Not more than 100 responses from Tier 2
    3. 200 responses from Tier 3 and 4 suppliers

Scope of Work

  • Field data collection has to be completed by the second month from the starting date of the project.
    • Ideally, field teams are experienced in 2 or more of the above tools (RubberWay questionnaire, HCVRN Nature Positive Farming questionnaire and field-based or remote sensing-based mapping), else training will be provided. Please indicate which tools your team is experienced in using we will provide the necessary training.
      • If remote-sensing based is preferred by the service provider, please respond with the process and note that the data has to be cross-checked with field-based samples.
    • Field teams have to be able to speak the local language at each survey location(i.e., Thai).
  • GPSNR estimates the necessary activities per farm and the time required to conduct them to be as follows:
  1. Explain purpose of visit (~15 mins)
  2. Get permission for personal data collection to ensure data protection (~5mins)
  3. Map farm via mapping based on the mapping method chosen by the service provider (e.g., field-based mapping or remote sensing cross-checked with field samples) (~90mins).
    1. Mapping for farms <4 hectares:
      1. Polygon mapping or GPS mapping is up to the discretion of the service provider.
    2. Polygon mapping for farms above 4 hectares:
      1. This is based on the EU regulation (see Annex A) that a polygon would be required for farmers over 4 hectares.
      2. At least 10% (~30 of the 300 farms must be polygon mapped)
    3. Fill in RubberWay questionnaire (~30mins)
    4. Fill in HCVRN Nature Positive Farming questionnaire (~30mins – 1 hour)
    5. Verify data before departure (~10mins)
  • GPSNR assumes:
    • Total time required: ~approximately 180 mins/3 hours per farm per field assistant.
    • Farms likely to be covered per day: 2 farms.
    • Total number of field assistant days required assuming 2 farms per day: 450 days
    • Total weeks required for 1 field assistant assuming 5 work days per week: 90 weeks
    • Total weeks required for two processors assuming 10 field assistants working simultaneously in one country: 9 weeks
    • This is an estimation of the time taken, we look forward to a comparison with the final recorded timings.
  • If you have other ideas on how to achieve the above objectives, please provide details about how you would design the study

Expected Deliverables

Specifically, GPSNR expects the consultant to:

 1. Map at least 300 farmers supplying to the participating processor in Thailand and provide the shapefiles to the processor and the GPSNR point of contact.

a.      There should at least be 10% (~30 farms out of 300 farms) that are polygon mapped, based on the requirements mentioned above and in Annex A.

 2. We would like a detailed account of the time and resources spent on 1. travelling to the farm, 2. On the farm and 3. Data analysis

a.      We would like to see a breakdown of the total time spent in each component. E.g., Total reported time spent on 1 farm + 1 analysis = 8hours, within that 2 hour (time taken to travel to farm), 0.5 hours (convincing the farmer), 0.5 hours (communicating to farmer about the tool), 20 mins (Mapping the farms), 30 mins (HCVN questionnaire), 30 mins (Rubberway questionnaire)

 3. An evaluation of the merits and limitations of each tool

a.      E.g., 3/11 farmers surveyed were more apprehensive about the mapping tool due to fear of exposing their location.

 4. A recommendation of the scalability of this pilot

a.      Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

b.     E.g., $X/farm is calculated but is not scalable due to what reason(s).

Proposal Format and Contents

The proposal should include the following:

1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

2. The timeline and key stages of operations based on Project Timeline below

3. Budget, including detailed breakdown of expected manpower, logistics, and costs based on Budget below

4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

 

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 10 March 2023 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and cheryl@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Project Timelines

 

Proposals submitted by consultant to stefano.savi@gpsnr.org

10 March 2023

Selection of consultant /
Notification to Unsuccessful Bidders

16 March 2023

Contract Award / Notification to Unsuccessful Bidders

17 March 2023

Initial methodology presentation and Q&A with subgroup

23 March 2023

Training sessions for tools 

Late March – Early April 2023

Update session with subgroup 

April 2023

Final Draft report and conclusion of project 

July 2023

 

Budget

The Platform is anticipating that a total budget of no more than €25,000 be allocated to this engagement.

Payment terms shall be:

·        20% at the signing of the contract

·        30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan.

·        50% on delivery of the final report

The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.

 

Evaluation Factors

 GPSNR will rate proposals based on the following factors, with cost being the most important factor:

1.        Responsiveness to the requirements set forth in this Request for Proposal

2.      Relevant past performance/ experience

3.      Samples of work

4.     Cost, including an assessment of total cost of ownership.

5.      Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

Annex

Annex A: EU Deforestation Regulation

‘geolocation’ means the geographical location of a plot of land described by means of latitude and longitude coordinates corresponding to at least one latitude and longitude point and using at least six decimal digits. For relevant commodities other than cattle, for plots of land of more than 4 hectares, the geographical location shall be provided using polygons, meaning sufficient latitude and longitude points to describe the perimeter of each plot of land.

Text obtained from Article 2: Definitions, point (29) of the Deforestation Regulation consolidated text dated 20/12/22Deforestation Regulation consolidated text 20-12-22


View RFP Document here

(Closed) Request For Proposal – Webpage design consultancy

Background

At GPSNR, we bring together companies, smallholders, academia and civil society to transform the natural rubber supply chain into a sustainable, equitable and fair one.

Even though it was launched just in 2018, more than 50% of the world’s natural rubber demand already finds membership in GPSNR. This is only a small reflection of the amount of work that has taken place over the last three years. 

 

Scope

We are seeking a web design consultancy to design, code and publish a webpage that documents important decisions along with easy access to reports, processes and other important information. Informally, we call this a GPSNR ‘cheat sheet’. The content for the webpage will be provided by the GPSNR secretariat.

 

Core Tasks

Working closely with the GPSNR secretariat, the consultant will:

  • Create and finalise three web-page mockup (wireframes, prototypes, and corresponding user interface components like templates, stylesheets, scripts, images, etc) for the team to choose from
  • Once the mock up has been chosen by the team, the consultant will include four rounds of feedback from the GPSNR secretariat and key stakeholders in the development of the final page
  • Integrate components in the CMS to allow review and testing, and make corresponding adjustments based on feedback received
  • Liaise with GPSNR’s Communications Manager to ensure that the mockups are feasible for the GPSNR website
  • Work with GPSNR’s CRM & Data Analytics Associate to integrate the webpage with Salesforce

 

Terms

The engagement will take place for a period of five weeks from 11th April to 16th May 2022. Interim dates for wireframes and approvals will be mutually agreed upon after confirmation. 

 

Necessary Competencies

  • Solid understanding of the concepts of user experience, user interface design principles and conceptual design.
  • Expert knowledge in Wordpress CMS and Elementor
  • Knowledge of Bootstrap, jQuery and AngularJS, HTML, and Elementor Shortcodes
  • Knowledge of industry-standard design tools such as Adobe Photoshop, Illustrator and Dreamweaver
  • Knowledge of Wordpress Content Management System, particularly with respect to page template design, will be considered an asset
  • Eye for design and attention to detail are essential

 

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  • Proposals will only be accepted from individuals or firms with experience relevant to this project.
  • Submissions must include 1)  a portfolio of previous work 2) a paragraph describing how the consultant would approach such a project 3) a financial proposal with a breakdown of how much each competent of the work would cost.
  • Proposals must be signed by a representative that is authorized to commit to the bidder’s company.
  • Proposals must be received by 6th April 2022 to be considered. Proposals should be submitted to bani.bains@gpsnr.org and stefano.savi@gpsnr.org for consideration.
  • To receive a copy of the draft content, applicants can email bani.bains@gpsnr.org

 

 

Project Timelines

The Request for Proposal timeline is as follows:

Submission of Proposal 6 Apr 2022
Selection of top bidders and further conversations 7 Apr 2022
Contract award/notification to unsuccessful bidders 11 Apr 2022
Work commences no later than 13 Apr 2022
Delivery of finalized webpage to GPSNR 16 May 2022

The above timeline is open to further adjustments based on discussions with the consultant and GPSNR’s ongoing key milestones.

 

Budget

The Platform is anticipating that a total budget of no more than 5,000 Singapore Dollars (SGD) be allocated to this engagement.

Payment terms shall be:

●       20% at the signing of the contract
●       30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
●       50% on delivery of the final page

 

Evaluation Factors

GPSNR will rate proposals based on the following factors:

  • Responsiveness to the requirements set forth in this Request for Proposals
  • Relevant past performance / experience and / or any samples of past work
  • Cost, including an assessment of total cost of ownership
  • Technical expertise/experience of bidder and the bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

 