(Closed) Request For Proposal – GPSNR-RFP-A02-028-Field Trials for HCSA Smallholders Toolkit and HCVN Nature Positive Farming programme for Natural Rubber Smallholders in Indonesia

Share This Post

Introduction

GPSNR

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2019. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs. Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that define GPSNR strategy and objectives.

As of October 2022, GPSNR has 157 smallholder members from 10 countries.

HCSA

Established in 2014, the HCSA sets the standard approach for implementing no deforestation commitments on the ground for any commercial crop grown in moist tropical forest landscapes (for example, of palm oil, wood pulp or cocoa). It is underpinned not only by a commitment to no deforestation, but also by a commitment to respect the rights and livelihoods of local people.

To this end, the HCSA has developed a Toolkit that provides practical guidance to help companies, local communities, and other stakeholders to agree on which lands should be used for commercial agriculture or forestry, what activities will take place on community lands, which areas of forests should be conserved, and how lands should be managed and monitored. 

HCVN

The Network is a member-based organization that promotes the High Conservation Value (HCV) Approach, a three-step methodology to identify and protect ecosystems, biodiversity, and the needs of local communities and indigenous groups where development takes place.

Over several years the HCV Network has developed smallholder adapted HCV procedures, tailored to certification schemes, including for RSPO, Better Cotton Initiative and Fairtrade. More recently, The HCV Network have developed Nature Positive Farming, a tool to scale up engagement with smallholder producers who are not certified, and support them transition towards no-conversion and HCV protection production.

Project Summary

GPSNR is working with a Partnerships for Forest (P4F) grant to create mechanisms and systems to support and sustain long-term participation of smallholder members on the platform.

Under the P4F grant, a collaborative effort between GPSNR and HCSA was proposed due to the timely development of the HCSA Smallholder Approach which required further trials towards the development of a global, cross commodity framework and practical guidance for smallholders. 

A joint Task Force comprising of GPSNR and HCSA members is seeking proposals to conduct field trials for the HCSA Smallholder Approach for natural rubber smallholders in Indonesia.

Depending on logistical and cost efficiencies proposed by bidders, the project could also include concurrent field trials for the High Conservation Value (HCVN) Nature Positive Farming programme for natural rubber smallholders.

————————————————————————————————–

Proposals should include a timeline and budget for either project option:

Option 1

Field trials only for the HCSA Smallholder Approach

 Option 2

Concurrent field trials for the HCSA Smallholder Approach and the HCVN Nature Positive Farming Programme

Key Project Details

Smallholder farms utilise approximately 12% of global agricultural land and smallholder farms are estimated to support a population of more than 2 billion people directly and indirectly[1]. Smallholder farms therefore play a critical role in food security, poverty reduction and sustainable development for a very large proportion of rural populations, globally. This being said, it is also important to identify the role of smallholder farmers in sustainable commodities production and trade.  

HCSA Smallholder Approach

The HCSA Smallholder Approach is being developed with the aim to provide a framework and practical guidance for smallholder groups to identify and manage forests and other conservation values in their administrative areas. It is designed to provide simple, clear steps to formulate and implement an initial plan to manage these forests and other conservation values sustainably. The HCSA Smallholder Approach was developed and tested in the Indonesian context and for smallholder farmers that produce palm oil in mixed production landscapes, i.e., in combination with other commodities including rubber, agroforestry systems, home gardens, and that manage forest areas as part of shifting cultivation regimes
or as customary forests.

Upon Request:

The project Task Force will provide interested bidders with the HCS Smallholder Approach toolkit to allow bidders to build their proposals in line with the requirements put forth in this tender. 

HCVN Nature Positive Farming

The Nature Positive Farming programme is an early engagement programme for companies and landscape initiatives to support non-certified smallholder farmers protect High Conservation Values and natural ecosystems as part of responsible sourcing commitments.

It is built around facilitated, structured dialogue with smallholders and their communities. It aims for conservation and support agreements between smallholders and project partners, for maintaining and enhancing environmental and social conservation values on and around their farms. The first field trial was conducted with smallholder producer communities in the Siak Pelalawan Landscape, Riau, Indonesia.

Upon Request:

The project Task Force will provide interested bidders with the HCVN Nature Positive Farming toolkit to allow bidders to build their proposals in line with the requirements put forth in this tender.    

[1] Lowder et al. 2016; Goldman et al. 2016

Deliverables

Proposals should provide a timeline and plan that covers the four project phases set out below. 

Proposals should include a timeline and budget for either project option:

Option 1
Field trials only for the HCSA Smallholder Approach

Option 2
Concurrent field trials for the HCSA Smallholder Approach and the HCVN Nature Positive Farming Programme

 Phase 1: Project Preparations

a.   Dialogue with key Task Force members, including understanding GPSNR’s (in-development) risk assessment approach

b. Assessment and proposal of suitable field trial locations for natural rubber smallholders in the following regions in Indonesia:

a.    North Sumatra, and/or

b.    Jambi, and/or

c.    South Sumatra

d.    Bidders may also propose other regions with reasons and justifications

c.    Initial networking with key actors on-site in Indonesia

 Phase 2: Outreach and Training

a.    Develop training systems and materials for implementing actors for the HCSA (and HCVN) toolkits, including training sessions for field staff

b. Plan for actively involving locally embedded actors in pilot activities and engagement with smallholders

Phase 3: Field Trials

a.    Plan to implement 1-2 field trials for the HCSA (and HCVN) toolkits with natural rubber smallholders, communities, or cooperatives in the proposed locations of Jambi and/or South Sumatra

b.    Plan should include:

§ Target total number of smallholders or farms involved in the trials

§ Level of actor engaged (e.g., village; cooperatives; individual smallholders) engaged for the field trials

§ Targets such as gender, minority, and youth representation

§ Description of the proposed relevant Areas(s) of Interest (ideally village-level trials, but project is open to trials with independent smallholder cooperatives)

o  In case areas under control by cooperatives or individual farmers deviate (significantly) from official village administrative areas, an outlook on how this will be considered during field trials and post-trial review

§ Description of field trial methods including an outlook whether different methods are going to be tested during field trials (in relation to verification of maps, assessment of vegetation strata, land use zoning, etc.) 

Noting ideal requirements for smallholder representatives or community-leads: adequate level of reading and writing ability

 The consultants would be responsible as well for providing technical guidance to smallholders throughout the trials

Phase 4: Post-Trial Review

a.    Analyse strengths and weaknesses of each toolkit from the perspective of natural rubber smallholders

b.    Provide recommendations (e.g. contexts on when/how to use the tools, areas of toolkit improvement, how the toolkits support delivering on the GPSNR systems i.e. risk assessment, risk mitigation, assurance framework, reporting framework and shared responsibility mechanism)

c.    Contribute to developing a strategy to upscale pilot activities in the project areas, or to other project areas

  Intended project outputs and outcomes

Through the field trials, the Task Force aims to develop a strong understanding of the feasibility of the HCSA (and HCVN) toolkits for the following:

1. Mapping: Areas for development / conservation areas / mixed, multi-layered production areas, e.g., community use areas including shifting cultivation, agroforestry, home gardens, others as applicable 

2.    Conservation: Toolkit that can be passed on to GPSNR smallholder communities to
effectively map and manage areas for conservation; to understand their land and
land-use plans; showcase their commitment to no-deforestation

 3. Integration with GPSNR Risk-based Approach: Toolkits as a risk mitigation tool that GPSNR member companies can use to identify and address land-use risks, and to channel funding and other related commitments accordingly

i.     Analysing the extent to which the toolkits can be a mitigation tool for specific/multiple policy commitments in the GPSNR Policy Framework and
other systems 

 Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for
Proposal:

 1.  A detailed technical proposal must be provided. This technical proposal must provide an overview of the proposed methodology for the three Phases of the project. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable. 

2.    A detailed price proposal must be provided. This price proposal should indicate the overall fixed price or expected price range for each Phase of the project, including daily rates and an estimated total number of days for each Phase of the project.   

 3.     Proposals will only be accepted from individuals or firms with experience relevant to this project. Examples of previous relevant work should be provided, as well as resumes of all key
personnel performing the work.

4.    Proposals must be signed by a representative that is authorised to commit the bidder’s company.

Project Timelines


The Request for Proposal timeline is as
follows:

Request for Proposal Issuance

31 October 2022

Proposal submitted by consultant to yeo.siyuan@gpsnr.org

28 November 2022

Selection of consultant /
Notification to Unsuccessful Bidders

5 December 2022

Completion of
Phase 1: Project Preparations

January 2022

Completion of
Phase 2: Outreach and Training

To be
proposed by the bidder

Completion of
Phase 3: Field Trials

To be
proposed by the bidder

Completion of
Phase 4: Post-Trials Review

To be
proposed by the bidder; latest May 2023.

 

The overall project should conclude no later than May 2023.

The above timeline may be further adjusted by GPSNR, or based on discussions with the
consultant and GPSNR’s ongoing key milestones.

Budget

The Platform is anticipating a total budget of up to 92,000 GBP for the project.

Payment terms shall be:

·      30% at the signing of the contract

·      10% upon completion of Phase 1: Project Preparations

·      10% upon completion of Phase 2: Outreach and Training

·      20% upon completion of Phase 3: Field Trials and Analysis

·      30% upon completion of the entire project

Evaluation Factors

GPSNR will rate proposals based on the following factors:

  1. Responsiveness to the requirements set forth in this RFP
  2. Methodology for completing all three Phases of the project
  3. Costs and expected timeline for all three Phases of the project
  4. Technical expertise/experience, including team composition, past performance/experience

When evaluating bids, GPSNR may request for more information as part of a full due diligence to understand bidders’ technical and commercial background, assess potential conflicts of interests and independence vis-à-vis natural rubber smallholders and the wider agricultural sector, and level of competence for the project.

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Digital Guidelines and Considerations

The consultant should commit to follow the guidelines specified in the Principles for Digital Development.

The principles of data protection legislation must be taken into account when processing personal data:

  • The data must be processed lawfully (lawfulness)
  • Data must only be processed if this is required and reasonable (fairness).
  • The data must be processed transparently (transparency).
  • The data must be processed for defined (time-limited), clear and legitimate purposes (earmarking).
  • Only as much data as is required may be processed (data minimisation).
  • Accuracy and currency must be ensured (data accuracy).
  • The principle of integrity and confidentiality must be guaranteed through an appropriate level of protection (data security).

More To Explore

Tender

(CLOSED) Request for Proposal – Traceability and Transparency Tools Comparison

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR), is an international Multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in November 2017. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.  Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define GPSNR strategy and objectives.

GPSNR has created three core working groups to help advance the platform’s mission to reduce social and environmental risks throughout the natural rubber supply chain.  Working Group 3 (WG3) is dedicated to Traceability and Transparency, with the objective to recommend tools to trace, assess the risk and achieve transparency of any given natural rubber product buyer’s supply chain.

To achieve the WG3 objective, we are requesting proposals for projects that will assess supply chain risks, achieve supply chain traceability and achieve supply chain transparency. 

Scope of Work and Objective

1: Take stock of the traceability and transparency requirements

Understand the requirements of the traceability and transparency tools through discussions and interviews with various members and EC of GPSNR. This includes

  • What level of traceability and transparency (T&T) different stakeholders desire while meeting the criteria and policy?
  • What level of T&T is needed in high risk areas and in low risk areas?
  • How they define high risk and low risk areas?
  • How they plan to identify high and low risk areas?
  • What data in the supply chain (based on the draft GPSNR sustainability criteria) are different stakeholders (particularly downstream rubber industry) agreeable to sharing and with what entities (such as GPSNR, NGOs, competitors, and suppliers), and on what conditions?
  • What data is absolutely confidential that can’t be shared (even with an entity like GPSNR on a strictly confidential basis)?
  • What costs they are willing to pay/ton for T&T in different risk profile areas?

2: Assess Methodologies and Effectiveness of Traceability and Transparency Tools

The following request for proposal asks for a study of the functionalities of traceability/transparency tools being used by the natural rubber and other similar industry sectors: 

  1. Supply chain and product tracking
  2. Supply chain mapping
  3. Satellite and remote sensing (incl. Artificial Intelligence opportunities)

The study should look at each tool’s methodology for identifying origin and collecting information and make recommendations for which tools work best (and which do not) regarding the following key areas:

  • The process of data collection and types of data that can be collected
  •  The ability of the tool to identify risk and/or contribute to a risk assessment in the following categories[1]:
  • Social: Protecting internationally recognized human rights and labor rights (UN Guiding Principles on Business and Human Rights and ILO Core Conventions), securing Free, Prior and Informed Consent, Recognizing rights of indigenous peoples and local communities, provision of community livelihoods, etc.
  • Environmental: Deforestation, protection of High Conservation Values (HCVs) and rare, threatened and endangered species, water quantity and quality, soil protection, protecting peat lands, etc.
  • Legality: Applicable local, national and international laws on human rights, labour, land use and the environment.
  • Analyze the usability of results delivered – functionality (is it user friendly – pragmatic – “ready to go”)
  • Analyze the types of data that are accessible by each tool for:
  • Social: Protecting internationally recognized human rights and labor rights (UN Guiding Principles on Business and Human Rights and ILO Core Conventions), securing Free, Prior and Informed Consent, Recognizing rights of indigenous peoples and local communities, provision of community livelihoods, etc.
  • Environmental: Deforestation, protection of High Conservation Values (HCVs) and rare, threatened and endangered species, water quantity and quality, soil protection, protecting peat lands, etc.
  • Legality: Applicable local, national and international laws on human rights, labour, land use and the environment.
  • Explore challenges with data sharing considering confidentiality and data ownership (within each tool), but also consider feasibility and the possibility of sharing information between tools.
  • Understand the reliability of data and the auditability of data (verify).  Consider each tools ability to be audited to 1st, 2nd, and 3rd party methods.  Consider the differences between tools that collect data via voluntary declaration of the suppliers vs onsite data collection by a 2nd or 3rd party.
  • Understand cost– what are other costs that need to be considered:
    • Set-up/prerequisite
    • Maintenance
    • Deployment
  • Understand the scalability of each tool.  At what geographic level can each tool perform and within what timeframes.
  • Adaptability of tool for use by GPSNR members to meet commitments and reporting requirements.

[1] Note: this bullet point is not asking the assessor to conduct a risk assessment themselves.  It is asking the assessor to identify which tools provide valuable data to evaluate and identify risk regarding specific environmental, social and legality factors.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed tools for analysis as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a description of previous relevant work, and a proposed schedule.
  3. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  4. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  5. Proposals must be received prior to 19th August 2020 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org for consideration.
  6. GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with, and will make an award to one of these “down-selected” individuals or firms.

Budget

The Platform is anticipating a total budget of no more than 30,000 Euros for the study. 

Payment terms shall be:

  • 50% at the signing of the contract
  • 50% on delivery of the final report

Evaluation Factors

GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  • Responsiveness to the requirements set forth in this Request for Proposal;
  • Relevant past performance/experience;
  • Samples of work;
  • Cost, including an assessment of total cost of ownership;
  • Technical expertise/experience of bidder and bidder’s staff;

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR  as determined solely by GPSNR in its absolute discretion.

Please submit your application to stefano.savi@gpsnr.org by 19 August 2020.

(Closed) Request For Proposal – GPSNR-RFP-A02-021-Comprehensive Disease Fighting Approach

Deadline for submission has been updated to 8th July 2022

Note: awarding of the contract will be subject to securing of full funding

1. Introduction

The Global Platform for Sustainable Naural Rubber is an international, multi-stakeholder, voluntary membership initiative committed to improving the socioeconomics and environmental performance of the natural rubber value chain.  Development of the GPSNR was intiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018.  Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.  Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

The GPSNR aims to support the natural rubber sector to become more sustainable. Key element in achieving  this is to ensure there is capacity among smallholders and industrial plantations to adopt best practices in NR  production.

GPSNR, through the GPSNR Capacity Building Working Group (Indonesia National Subgroup), is seeking to engage service providers to implement the following aspects of disease fighting for natural rubber trees in Indonesia:

  1. On-site inspection for diseases across multiple regions
  2. Pilot rapid response mechanism for disease fighting
  3. Develop and distribute materials on disease fighting
  4. Coaching smallholders on disease treatment and prevention

Proposed programmes should be implemented in line with GPSNR environmental and social commitments and values, based on the GPSNR Policy Framework1.


1https://sustainablenaturalrubber.org/policy-framework/

2. Objectives and Scope of Work     

There are approximately 2.25M smallholders in Indonesia, representing 83% of national natural rubber production (3.6 M tonnes). Smallholders cultivate less than 2 ha of land with an average yield of slightly below 1 ton/ha, as compared to state and private commercial plantations achieving 1.4 ton/ha and 1.5 ton/ha respectively. 

Diseases are a major threat to rubber trees, with 80 – 90% of farmers experiencing tree diseases in 2019 in West Kalimantan and South Sumatra, and 60% in Jambi. When disease (pink and white root rot) attacks trees, the trees should be cut down, leaving not even the stem in the ground, to minimise infection of other trees. A new rubber leaf fall disease is spreading in Sumatra and Kalimantan. This disease causes leaf fall more than twice a year and reduces annual yield by up to 40%. The treatment for this disease is expensive and is often not implemented by smallholders.

Five provinces contribute 66.5% of national production: South Sumatra, North Sumatra, Jambi, Riau, and West Kalimantan. South Sumatra province is Indonesia’s largest and most productive area. Its natural rubber area is almost 23% of the total national productive area and smallholders’ plantations take up 98.5% of this area. The productivity of smallholders in South Sumatra is the highest among smallholder areas in Indonesia, producing 1.3 ton/ha, and more likely to have received GAP training. In 2019 the government announced a replanting plan for 2019 – 2027, with a focus on South Sumatra (92,600 ha), South Kalimantan (76,550 ha) and Jambi (69,900 ha). However, this plan has no large-scale lending programme associated with it and is to be executed by local governments and has not yet been implemented. Demand for replanting is strongest in Jambi, where 40% of farmers are willing to undertake replanting. Demand is lowest in West Kalimantan, where only 1 farmer out of 79 was contemplating. Most likely the demand in Jambi is due to peak planting being undertaken in 1995 – 2005 and the majority of the trees are approaching their maximum productive age, and Jambi farmers are more aware of the importance of good quality clones and their impact on yield – they also have the highest rate of nursery clone purchase – and have suffered less from disease. 

The GPSNR Policy Framework provides a framework for GPSNR member companies to align their natural rubber purchasing policies on all aspects of sustainability: economic, environmental, and social. Modelled around the Platform’s 12 Principles of Sustainable Natural Rubber, the GPSNR policy framework sets out eight overarching themes that include commitments to legal compliance, community livelihoods, healthy, functioning ecosystems (including no deforestation), and respecting all human rights.

In line with the GPSNR Policy Framework, the GPSNR Secretariat has prepared guidance on the Policy Evaluation Procedure to support members in aligning their corporate policies with the GPSNR Policy Framework.

GPSNR Smallholders Policy Equivalent for Smallholder Members

As of March 2022, GPSNR currently has 112 smallholder members across 10 countries: Brazil, Cambodia, Ghana, India, Indonesia, Ivory Coast, Myanmar, Sri Lanka, Thailand, and Vietnam.

While this represents a small percentage of the millions of smallholder producers globally, GPSNR is committed to developing the mechanisms, tools, and processes to support smallholders globally in adopting best practices for natural rubber production in terms of economic, environmental and social outcomes. 

Source:
Financial Assessment of Smallholder Natural Rubber Production in Indonesia. July 2020. USAID Green Invest Asia, HeveaConnect, SNV and Financial Access.
2


2https://www.facsglobal.com/wp-content/uploads/2020/12/Final-Rubber-report-2020.pdf

3. Expected Deliverables

GPSNR has outlined four project stages as part of the Comprehensive Disease Fighting Approach.

Note: All available and collated information through this project will compiled, analysed and integrated with existing literature, to further contribute to developing a
full inventory of natural rubber disease in Indonesia and globally.

Stage 1: On-site inspection for diseases on a regional basis

Expected length of time:
3-4 months

Objective:
To carry out on-location inspections for presence of diseases in key rubber producing regions in Indonesia

The consultant should put forth recommendations

Key evaluation metrics:

  • Inspections should be carried out by accredited technical experts on rubber diseases in Indonesia
  • The proposal should clearly state intended regions for inspections and justify these selections. A minimum of four major natural rubber producing regions should be presented.

  • Inspections should define and document the following (non-exhaustive) list of key parameters and findings:
    • Regions and locations (GPS-data; statistically randomised sample of locations)
    • Affected area sizes and hectares inspected, as well as a map of healthy locations
    • Map of rubber growing regions; randomly sampled process of disease mapping and areas inspected
    • Number of smallholders affected
    • Photos (high quality) and other visual evidence of diseases
    • In general, all diseases reported by the interviewed farmers should be properly documented (location, phenomena, season of occurrence, photos …). Specific attention should be given to the occurrence/symptoms of the following diseases (Type of diseases, e.g.,):
      • White root disease (e.g., rigidoporus microporus fungus)
      • Leaf disease (Pestalotiopsis)
      • Fusarium
      • Tapping panel dryness (TPD)
      • Colletotrichum
      • Animal / insect / pest issues
      • All other forms of diseases / issues to be documented
      • Screen for emergent threats or new disease developments
    • History of site (e.g., past crop activities)
    • Clone types inspected
    • Interactions, if any, between natural rubber and other crops such as palm oil
    • Other details to be included by the bidder

Expected outputs

Documentation and public sharing

The overall findings of Stage 1 are expected to be documented in a formal report or detailed presentation. This will be shared with GPSNR and made publicly available, and also shared actively within the natural rubber eco-system in Indonesia (and other countries).

  • The inspection team could also be invited to share the results through a GPSNR members-only or public webinar
  • The formal report or detailed presentation is expected to serve as a living document that will be continuously open for updates and further inputs beyond the timeline of this project

Further Stages of this project

The overall findings of Stage 1 will also shape the subsequent Stages of this project, with more details outlined below.

Stage 2: Pilot Rapid Response Mechanism for Disease Fighting

Expected length of time:
To begin development concurrently with Stage 1 (Inspection), and to be in operation within 3-4 months of project starting, until project end (November 2023)

Objective:
To conceptualise and implement a pilot mechanism for smallholders to reach out to disease experts for technical advice on diseases, and to allow rapid response by experts if a situation warrants

Key evaluation metrics:

  • To establish pilot channels (such as call or digital “hotlines”) for smallholders to reach out to disease experts. This could be in any of the following (non-exhaustive) forms:
    • Telephone line
    • Whatsapp group
    • Facebook group
    • Any other possibilities
  • Outline operational and maintenance needs for the communication channel such as the following (non-exhaustive):
    • Manpower costs
    • Digital or infrastructural costs
    • Others

  • Mechanism of immediate follow-up on areas found to be vulnerable to diseases

  • Propose a long-term and sustainable model of the “hotline” mechanism, including overview of the stated costs above
    • Actual operationalising for the longer-term will depend on the effectiveness of the mechanism during the project pilot period

Expected outputs

“Hotline” Mechanism

The “hotline” mechanism, in a form proposed by the bidder, should be in operation within 3-4 months of the project starting, and be evaluated under the following criteria:

  • Uptake and usage by smallholders (to be documented on a regional basis)
  • Operational and maintenance costs
  • Effectiveness in addressing or responding to smallholder queries
  • Effectiveness in identifying vulnerable regions

Stage 3: Develop and Distribute Materials on Disease Fighting

Expected length of time:
To begin development concurrently with Stage 1 (Inspection), and to be ready for distribution to smallholder communities within 3-4 months of project start

Objective:
To develop and distribute disease fighting materials to smallholder communities, including information relating to the Rapid Response “hotline” mechanism to be developed in Stage 2

Key evaluation metrics:

  • Outline proposed content for the materials
  • Outline proposed format of the materials (e.g., video, leaflets, brochures, poster infographics etc.)

  • Outline intended manner of distribution to smallholders and their communities, including specific locations and local partners who could help with distribution (if any)

  • Note: as technical experts on diseases and experts on smallholder interactions in Indonesia, the selected bidder is expected to be in-charge of the content and distribution of the materials
    • GPSNR may separately tender for a graphic designer to work with the bidder to format content into visually effective materials

Expected outputs

  • Materials to be shared in physical or communal venues where smallholders convene on a regular basis

Stage 4: Disease Fighting Coaching

Expected length of time:
To begin after Stage 1 (Inspection) is completed, and to be planned based on the findings of Stage 1 (Inspection) and tailored toward ongoing inputs received through Stage 2 (Rapid Response “hotline”)

Objective:
To conduct on-site training for smallholders on disease treatment and prevention

Key evaluation metrics:

  • Outline coaching plans for the following scenarios, based on the results of Stage 1 (Inspection) and Stage 2 (Rapid Response “hotline”)
    • Scenario A: coaching plan for high evidence of disease outbreak in one or more regions
    • Scenario B: coaching plan for low-to-no evidence of disease outbreak in one or more regions

  • Outline intended number of train-the-trainer sessions depending on Scenarios A and B

  • Outline plan for demonstration plots based on location-specific diseases, or case-studies

  • Outline plan to provide, safeguard, and instruct smallholders on using approved materials, tools (e.g., approved agrichemicals; reference sources to procure such materials) for prevention and treatment purposes
  • Outline number of smallholders to be coached within the given timeframe

Expected outputs

  • Smallholder coaching sessions to be conducted based on the findings of Stage 1 (Inspection) and feedback received in Stage 2 (Rapid Response “hotline”)

Overall Metrics

Submitted proposals should provide justifications and details on the costs, timeline, and rationales for each of the Stages above, with a focus on the following rubber-producing regions:

  1. Northern Sumatra
  2. Southern Sumatra
  3. Central Sumatra
  4. West Kalimantan
  5. East Kalimantan

The GPSNR Capacity Building Working Group (Indonesia National Subgroup) may prioritise funding for specific regions based on relative productivity, coverage of existing coaching services, socio-economic needs, or other considerations.

Service providers are also expected to operate in line with principles and values set forth in the GPSNR Policy Framework3 such as commitment to environmental protection and sustainability, zero deforestation, community engagement and FPIC etc.

The selected service providermay also be expected to work closely with the GPSNR Capacity Building Working Group (Indonesia National Subgroup) to fine-tuned or further augment the clone selection and delivery timelines.


3https://sustainablenaturalrubber.org/policy-framework/

4. Proposal Format and Contents

The proposal should include the following:

  1. A workplan that outlines all key activities of the deliverables (as outlined in 3. Expected Deliverables above)
  2. Timeline and key stages of operations (based on 5. Expected Timeline below)
  3. Budget, including detailed breakdown of expected manpower, logistics, and costs (based on 6. Budget below)
  4. Description of past work and proof of technical expertise on natural rubber disease is highly critical for this RFP
    • Description of disease identification and methodologies
  5. A list of project team members with their roles in the project and associated qualifications


5. Expected Timelines

The work shall begin by July 2022 and the various phases shall be completed in accordance with the approximate timeline below:

RFP publication 25 May 2022
Submission deadline for proposals 8 July 2022
Contract Award July 2022
First Full Review November 2022
Second Full Review February 2023
Third Full Review May 2023
Fourth Review August 2023
Final Review and Project Conclusion November
2023

Consultants should detail a project timeline with milestones that are approximately in line with the above timeline.

Consultants will also provide fortnightly or monthly progress updates to the GPSNR Capacity Working Group, or on an as-needed basis.

6. Budget

The Platform is anticipating that the total budget of no more than 220,000 EUR be allocated to the Four Stages of the project. The approximate expected breakdown for each Stage is as such:

  • Stage 1 and 2: 120,000 EUR

  • Stage 3: 50,000 EUR (sum inclusive of graphic designing of visuals for smallholder communities)

  • Stage 4: 50,000 EUR

Bidders should propose budget allocations for each Stage as they deem suitable.

Payment terms shall be proposed by the bidder and discussed with GPSNR, in line with each Stage of the project.

7. Evaluation Factors

GPSNR will rate proposals based on the following factors:

  1. Responsiveness to the requirements set forth in this Request for Proposal
  2. Relevant past performance/experience/accreditation of the bidder
  3. Samples of work (e.g., previous training or coaching programmes in Indonesia)
  4. Technical expertise/experience of bidder and bidder’s staff
  5. Proposed timeline of operations

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Scroll to Top