(Closed) Request For Proposal – GPSNR-RFP-A02-021-Comprehensive Disease Fighting Approach

Share This Post

Deadline for submission has been updated to 8th July 2022

Note: awarding of the contract will be subject to securing of full funding

1. Introduction

The Global Platform for Sustainable Naural Rubber is an international, multi-stakeholder, voluntary membership initiative committed to improving the socioeconomics and environmental performance of the natural rubber value chain.  Development of the GPSNR was intiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2018.  Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.  Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define strategy and objectives.

The GPSNR aims to support the natural rubber sector to become more sustainable. Key element in achieving  this is to ensure there is capacity among smallholders and industrial plantations to adopt best practices in NR  production.

GPSNR, through the GPSNR Capacity Building Working Group (Indonesia National Subgroup), is seeking to engage service providers to implement the following aspects of disease fighting for natural rubber trees in Indonesia:

  1. On-site inspection for diseases across multiple regions
  2. Pilot rapid response mechanism for disease fighting
  3. Develop and distribute materials on disease fighting
  4. Coaching smallholders on disease treatment and prevention

Proposed programmes should be implemented in line with GPSNR environmental and social commitments and values, based on the GPSNR Policy Framework1.


1https://sustainablenaturalrubber.org/policy-framework/

2. Objectives and Scope of Work     

There are approximately 2.25M smallholders in Indonesia, representing 83% of national natural rubber production (3.6 M tonnes). Smallholders cultivate less than 2 ha of land with an average yield of slightly below 1 ton/ha, as compared to state and private commercial plantations achieving 1.4 ton/ha and 1.5 ton/ha respectively. 

Diseases are a major threat to rubber trees, with 80 – 90% of farmers experiencing tree diseases in 2019 in West Kalimantan and South Sumatra, and 60% in Jambi. When disease (pink and white root rot) attacks trees, the trees should be cut down, leaving not even the stem in the ground, to minimise infection of other trees. A new rubber leaf fall disease is spreading in Sumatra and Kalimantan. This disease causes leaf fall more than twice a year and reduces annual yield by up to 40%. The treatment for this disease is expensive and is often not implemented by smallholders.

Five provinces contribute 66.5% of national production: South Sumatra, North Sumatra, Jambi, Riau, and West Kalimantan. South Sumatra province is Indonesia’s largest and most productive area. Its natural rubber area is almost 23% of the total national productive area and smallholders’ plantations take up 98.5% of this area. The productivity of smallholders in South Sumatra is the highest among smallholder areas in Indonesia, producing 1.3 ton/ha, and more likely to have received GAP training. In 2019 the government announced a replanting plan for 2019 – 2027, with a focus on South Sumatra (92,600 ha), South Kalimantan (76,550 ha) and Jambi (69,900 ha). However, this plan has no large-scale lending programme associated with it and is to be executed by local governments and has not yet been implemented. Demand for replanting is strongest in Jambi, where 40% of farmers are willing to undertake replanting. Demand is lowest in West Kalimantan, where only 1 farmer out of 79 was contemplating. Most likely the demand in Jambi is due to peak planting being undertaken in 1995 – 2005 and the majority of the trees are approaching their maximum productive age, and Jambi farmers are more aware of the importance of good quality clones and their impact on yield – they also have the highest rate of nursery clone purchase – and have suffered less from disease. 

The GPSNR Policy Framework provides a framework for GPSNR member companies to align their natural rubber purchasing policies on all aspects of sustainability: economic, environmental, and social. Modelled around the Platform’s 12 Principles of Sustainable Natural Rubber, the GPSNR policy framework sets out eight overarching themes that include commitments to legal compliance, community livelihoods, healthy, functioning ecosystems (including no deforestation), and respecting all human rights.

In line with the GPSNR Policy Framework, the GPSNR Secretariat has prepared guidance on the Policy Evaluation Procedure to support members in aligning their corporate policies with the GPSNR Policy Framework.

GPSNR Smallholders Policy Equivalent for Smallholder Members

As of March 2022, GPSNR currently has 112 smallholder members across 10 countries: Brazil, Cambodia, Ghana, India, Indonesia, Ivory Coast, Myanmar, Sri Lanka, Thailand, and Vietnam.

While this represents a small percentage of the millions of smallholder producers globally, GPSNR is committed to developing the mechanisms, tools, and processes to support smallholders globally in adopting best practices for natural rubber production in terms of economic, environmental and social outcomes. 

Source:
Financial Assessment of Smallholder Natural Rubber Production in Indonesia. July 2020. USAID Green Invest Asia, HeveaConnect, SNV and Financial Access.
2


2https://www.facsglobal.com/wp-content/uploads/2020/12/Final-Rubber-report-2020.pdf

3. Expected Deliverables

GPSNR has outlined four project stages as part of the Comprehensive Disease Fighting Approach.

Note: All available and collated information through this project will compiled, analysed and integrated with existing literature, to further contribute to developing a
full inventory of natural rubber disease in Indonesia and globally.

Stage 1: On-site inspection for diseases on a regional basis

Expected length of time:
3-4 months

Objective:
To carry out on-location inspections for presence of diseases in key rubber producing regions in Indonesia

The consultant should put forth recommendations

Key evaluation metrics:

  • Inspections should be carried out by accredited technical experts on rubber diseases in Indonesia

  • The proposal should clearly state intended regions for inspections and justify these selections. A minimum of four major natural rubber producing regions should be presented.
  • Inspections should define and document the following (non-exhaustive) list of key parameters and findings:
    • Regions and locations (GPS-data; statistically randomised sample of locations)
    • Affected area sizes and hectares inspected, as well as a map of healthy locations
    • Map of rubber growing regions; randomly sampled process of disease mapping and areas inspected
    • Number of smallholders affected
    • Photos (high quality) and other visual evidence of diseases
    • In general, all diseases reported by the interviewed farmers should be properly documented (location, phenomena, season of occurrence, photos …). Specific attention should be given to the occurrence/symptoms of the following diseases (Type of diseases, e.g.,):
      • White root disease (e.g., rigidoporus microporus fungus)
      • Leaf disease (Pestalotiopsis)
      • Fusarium
      • Tapping panel dryness (TPD)
      • Colletotrichum
      • Animal / insect / pest issues
      • All other forms of diseases / issues to be documented
      • Screen for emergent threats or new disease developments
    • History of site (e.g., past crop activities)
    • Clone types inspected
    • Interactions, if any, between natural rubber and other crops such as palm oil
    • Other details to be included by the bidder

Expected outputs

Documentation and public sharing

The overall findings of Stage 1 are expected to be documented in a formal report or detailed presentation. This will be shared with GPSNR and made publicly available, and also shared actively within the natural rubber eco-system in Indonesia (and other countries).

  • The inspection team could also be invited to share the results through a GPSNR members-only or public webinar

  • The formal report or detailed presentation is expected to serve as a living document that will be continuously open for updates and further inputs beyond the timeline of this project

Further Stages of this project

The overall findings of Stage 1 will also shape the subsequent Stages of this project, with more details outlined below.

Stage 2: Pilot Rapid Response Mechanism for Disease Fighting

Expected length of time:
To begin development concurrently with Stage 1 (Inspection), and to be in operation within 3-4 months of project starting, until project end (November 2023)

Objective:
To conceptualise and implement a pilot mechanism for smallholders to reach out to disease experts for technical advice on diseases, and to allow rapid response by experts if a situation warrants

Key evaluation metrics:

  • To establish pilot channels (such as call or digital “hotlines”) for smallholders to reach out to disease experts. This could be in any of the following (non-exhaustive) forms:
    • Telephone line
    • Whatsapp group
    • Facebook group
    • Any other possibilities

  • Outline operational and maintenance needs for the communication channel such as the following (non-exhaustive):
    • Manpower costs
    • Digital or infrastructural costs
    • Others
  • Mechanism of immediate follow-up on areas found to be vulnerable to diseases
  • Propose a long-term and sustainable model of the “hotline” mechanism, including overview of the stated costs above
    • Actual operationalising for the longer-term will depend on the effectiveness of the mechanism during the project pilot period

Expected outputs

“Hotline” Mechanism

The “hotline” mechanism, in a form proposed by the bidder, should be in operation within 3-4 months of the project starting, and be evaluated under the following criteria:

  • Uptake and usage by smallholders (to be documented on a regional basis)
  • Operational and maintenance costs
  • Effectiveness in addressing or responding to smallholder queries
  • Effectiveness in identifying vulnerable regions

Stage 3: Develop and Distribute Materials on Disease Fighting

Expected length of time:
To begin development concurrently with Stage 1 (Inspection), and to be ready for distribution to smallholder communities within 3-4 months of project start

Objective:
To develop and distribute disease fighting materials to smallholder communities, including information relating to the Rapid Response “hotline” mechanism to be developed in Stage 2

Key evaluation metrics:

  • Outline proposed content for the materials

  • Outline proposed format of the materials (e.g., video, leaflets, brochures, poster infographics etc.)
  • Outline intended manner of distribution to smallholders and their communities, including specific locations and local partners who could help with distribution (if any)
  • Note: as technical experts on diseases and experts on smallholder interactions in Indonesia, the selected bidder is expected to be in-charge of the content and distribution of the materials
    • GPSNR may separately tender for a graphic designer to work with the bidder to format content into visually effective materials

Expected outputs

  • Materials to be shared in physical or communal venues where smallholders convene on a regular basis

Stage 4: Disease Fighting Coaching

Expected length of time:
To begin after Stage 1 (Inspection) is completed, and to be planned based on the findings of Stage 1 (Inspection) and tailored toward ongoing inputs received through Stage 2 (Rapid Response “hotline”)

Objective:
To conduct on-site training for smallholders on disease treatment and prevention

Key evaluation metrics:

  • Outline coaching plans for the following scenarios, based on the results of Stage 1 (Inspection) and Stage 2 (Rapid Response “hotline”)
    • Scenario A: coaching plan for high evidence of disease outbreak in one or more regions
    • Scenario B: coaching plan for low-to-no evidence of disease outbreak in one or more regions
  • Outline intended number of train-the-trainer sessions depending on Scenarios A and B
  • Outline plan for demonstration plots based on location-specific diseases, or case-studies
  • Outline plan to provide, safeguard, and instruct smallholders on using approved materials, tools (e.g., approved agrichemicals; reference sources to procure such materials) for prevention and treatment purposes
  • Outline number of smallholders to be coached within the given timeframe

Expected outputs

  • Smallholder coaching sessions to be conducted based on the findings of Stage 1 (Inspection) and feedback received in Stage 2 (Rapid Response “hotline”)

Overall Metrics

Submitted proposals should provide justifications and details on the costs, timeline, and rationales for each of the Stages above, with a focus on the following rubber-producing regions:

  1. Northern Sumatra
  2. Southern Sumatra
  3. Central Sumatra
  4. West Kalimantan
  5. East Kalimantan

The GPSNR Capacity Building Working Group (Indonesia National Subgroup) may prioritise funding for specific regions based on relative productivity, coverage of existing coaching services, socio-economic needs, or other considerations.

Service providers are also expected to operate in line with principles and values set forth in the GPSNR Policy Framework3 such as commitment to environmental protection and sustainability, zero deforestation, community engagement and FPIC etc.

The selected service providermay also be expected to work closely with the GPSNR Capacity Building Working Group (Indonesia National Subgroup) to fine-tuned or further augment the clone selection and delivery timelines.


3https://sustainablenaturalrubber.org/policy-framework/

4. Proposal Format and Contents

The proposal should include the following:

  1. A workplan that outlines all key activities of the deliverables (as outlined in 3. Expected Deliverables above)
  2. Timeline and key stages of operations (based on 5. Expected Timeline below)
  3. Budget, including detailed breakdown of expected manpower, logistics, and costs (based on 6. Budget below)
  4. Description of past work and proof of technical expertise on natural rubber disease is highly critical for this RFP
    • Description of disease identification and methodologies
  5. A list of project team members with their roles in the project and associated qualifications

5. Expected Timelines

The work shall begin by July 2022 and the various phases shall be completed in accordance with the approximate timeline below:
RFP publication25 May 2022
Submission deadline for proposals8 July 2022
Contract AwardJuly 2022
First Full ReviewNovember 2022
Second Full ReviewFebruary 2023
Third Full ReviewMay 2023
Fourth ReviewAugust 2023
Final Review and Project ConclusionNovember
2023

Consultants should detail a project timeline with milestones that are approximately in line with the above timeline.

Consultants will also provide fortnightly or monthly progress updates to the GPSNR Capacity Working Group, or on an as-needed basis.

6. Budget

The Platform is anticipating that the total budget of no more than 220,000 EUR be allocated to the Four Stages of the project. The approximate expected breakdown for each Stage is as such:

  • Stage 1 and 2: 120,000 EUR
  • Stage 3: 50,000 EUR (sum inclusive of graphic designing of visuals for smallholder communities)
  • Stage 4: 50,000 EUR

Bidders should propose budget allocations for each Stage as they deem suitable.

Payment terms shall be proposed by the bidder and discussed with GPSNR, in line with each Stage of the project.

7. Evaluation Factors

GPSNR will rate proposals based on the following factors:

  1. Responsiveness to the requirements set forth in this Request for Proposal

  2. Relevant past performance/experience/accreditation of the bidder

  3. Samples of work (e.g., previous training or coaching programmes in Indonesia)

  4. Technical expertise/experience of bidder and bidder’s staff

  5. Proposed timeline of operations

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

More To Explore

Request For Proposal – GPSNR-RFP-C03-036-Review and support the development of a Central Repository

Introduction & Background
The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include rubber products manufacturers, natural rubber suppliers and processors (PPTs), end users, smallholders, and civil society organisations. 

The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only.  Traditionally tracing each companies supply chain takes on an individualistic approach due to the sensitive nature of the data. However, to expedite the enhancement of traceability in view of EUDR, the SG has decided on a collaborative approach by developing a Central Repository. 

The Central Repository functions as a database for storing polygons and supply chain information contributed by individual members. It will also link the smallholders, PPTs and manufacturers on a single platform while reducing duplicated mapping efforts between different manufacturers. The Repository should allow for easy extraction of information for GPSNR’s Due Diligence System and be integrated with the EU information system. Moreover, the repository should either integrate different Risk, Traceability and Deforestation mapping tools or have the data formatted in a way that allows for seamless input into the tools. 

In addition, considering the sensitive nature of individual companies’ supply chain information, the platform must implement various layers of access control. This will ensure that each manufacturer can only access information pertaining to their own supply chain. Furthermore, the repository should have distinct tiers of users, including end users, manufacturers, PPTs, and smallholders, with each tier granted access privileges relevant to their role.

Objectives and Scope of Work/ Deliverables
GPSNR expects the consultant to deliver the following:

  1. Craft a database that stores polygon and supply chain information to the plantation level and allows for the upload of geo-mapping information. 
    1. The database should also have an online dashboard view of mapped / Mapping-in-progress farmlands, contract/seller invoice information – outstanding and shipped)

  2. The Central Repository should allow data to flow to and from or store data in a way that is compatible for the uses below:
    1. Traceability tool providers (Eg – Koltiva, TRST01, Harmuni (Agridence etc))
    2. Deforestation mapping tools (Eg – LiveEO, Satelligence, Starling etc)
    3. Risk assessment systems/tools (Eg – ASI Tool or Others as available etc)

  3. Create levels of access authorizations for different accounts within the platform – 
    1. User accounts for uploading geo mapped data
    2. Access to viewing the geo-mapped data linked to user accounts for the PPTs and Manufacturers
      1. Users should only have access to information from within their own supply chains or information that they input to the repository
      2. Users should be able to form links across different tiers. For example, users should be able to form links between smallholders and PPTs, PPTs and manufacturers. 
      3. When there are several members which require access to geo mapped data from one user, the platform should have the ability to extend access authorization to multiple users.
    3. Extracting information from Due Diligence Systems and integrating it with the EU Information System (this should be limited to manufacturers only)

  4. The platform should be compliant with applicable data privacy norms and regulations which include but are not limited to the GDPR and PDPA.

  5. A fee structure including management of shared cost arising from overlapping access to geo mapped data.

  6. Data protection and cyber security policies

  7. Service Level Agreements including downtime, maintenance, customer support and service, updates.

  8. Data Backup

  9. Server location – Singapore (Preferred)

  10. A timeline for development of the Central Repository (milestones with details)

  11. Optional – Deforestation monitoring tool integrated with central repository and the applicable fee structures

Proposal Format and Contents
The proposal should include the following:

  1. A workplan that outlines all key activities of the deliverables (as outlined in Expected Deliverables above)
  2. Timeline and key stages of operations (based on Project Timeline below) 
  3. Budget, including detailed breakdown of expected manpower, logistics, and costs 
  4. Description of past work and technical expertise that is relevant to this RFP
  5. A list of project team members with their roles in the project and associated qualifications.

Submission Guidelines & Requirements 
The following submission guidelines & requirements apply to this Request for Proposal: 

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project. 
  2. Examples of previous relevant work should be provided as well. 
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable. 
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project, a cost breakdown, and daily rates and an estimated total number of days. 
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company. 
  6. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration. 
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic. 

Project Timelines 

RFP Published

4 Sep 2023

Proposal Submission Deadline

25 Sep 2023

Contract Awarded

9 Oct 2023

First consultation with Manufacturer’s Subgroup 

23 Oct 2023

Bi-weekly progress updates

23 Oct – 18 Dec

Final Report + Deliverable submission

19 Dec 2023

Budget
The Platform will review budget proposals from service providers and the budget will comprise an important part of awarding the contract.

Payment terms shall be:

  • 20% at the signing of the contract
  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
  • 40% on go-live 
  • Balance 10% – 1 month after go-live

Evaluation Factors
GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  1. Responsiveness to the requirements set forth in this Request for Proposal
  2. Relevant past performance/ experience
  3. Samples of work
  4. Cost, including an assessment of total cost of ownership
  5. Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.


View RFP Document here

Tender

(CLOSED) Request for Proposal – Study on Living Income Gap in Global Natural Rubber Value Chains – Indonesia

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR), is an international Multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in November 2017. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.  Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that will define GPSNR strategy and objectives.

Through a process led by the Equity Working Group, the Platform has begun an investigation into how value can be equitably distributed across the entire natural rubber value chain. To achieve this aim, it is important for the Platform to gather information about the following metrics in different countries:

i) the prevailing net household income of rubber smallholders;

ii) the detailed cost of production for rubber (input costs, labor etc);

iii) the living income for rubber smallholders;

iv) the living income gap and v) the living income reference price for rubber (the price at which the living income benchmark can be reached).

The Platform has decided to limit the focus of this initial study to Ivory Coast, Indonesia, Thailand, and Myanmar and the consultant is expected to collect information on the aforementioned metrics in Indonesia for this study.

Given that living income data is not readily available for each country, alternative benchmarks should be used where relevant and applicable. A list of potential benchmarks and preliminary data are illustrated in the attached document. To facilitate cross-country comparisons of income data and living income levels, the consultant is expected to use consistent units of measurement (per household / per workforce / per person) throughout this study.

The consultant will collect the information via desktop study, interviewing of GPSNR members, research institutes, social NGOs, governmental organizations, etc.  A primary list of stakeholders will be provided by the Secretariat together with the Equity Working Group members.  A complementary list will be developed by the consultant.  Regular contact and updating to the Equity Working Group together with the Secretariat will be required. Travel plans shall be made by the consultant where possible and necessary.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to 19th August 2020 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org for consideration.
  7. GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with, and will make an award to one of these “down-selected” individuals or firms.

Budget

The Platform is anticipating that a total budget of no more than 10,500 Euros be allocated to this engagement.

Payment terms shall be:

  • 50% at the signing of the contract
  • 50% on delivery of the final report

Evaluation Factors

GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  • Responsiveness to the requirements set forth in this Request for Proposal;
  • Relevant past performance/experience;
  • Samples of work;
  • Cost, including an assessment of total cost of ownership;
  • Technical expertise/experience of bidder and bidder’s staff;
  • The ability to collect information at the global and local level.

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Please submit your application to stefano.savi@gpsnr.org by 19 August 2020.

Scroll to Top