(Closed) Request for Proposal – GPSNR Knowledge Sharing Platform (GPSNR-RFP-A02-016)

Share This Post

Introduction & Background

The Global Platform for Sustainable Natural Rubber (GPSNR), is an international Multi-Stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Development of the GPSNR was initiated by the CEOs of the World Business Council for Sustainable Development (WBCSD) Tire Industry Project (TIP) in 2019. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.  Representatives from each of these stakeholder groups have contributed to the development of the Singapore-based platform and the wide-reaching set of priorities that define GPSNR strategy and objectives.

The GPSNR Secretariat and the GPSNR Capacity Building Working Group, through the GPSNR Knowledge Sharing Platform Task Force, are jointly overseeing the development and eventual operations and maintenance of a digital GPSNR Knowledge Sharing Platform.

This digital platform is envisaged to be an easily accessible, multi-lingual and expandable knowledge platform for smallholders and other actors based on quality-controlled information. Besides providing technical information on the latest Good Agricultural Practices it will provide access to live market conditions on natural rubber such as prices on key exchanges, projected supply, and demand shifts, as well as overall global market developments. The digital platform will also incorporate communication functions such as live chat and forum with built-in translation tools to allow smallholders to share and communicate seamlessly across different countries. Another crucial aspect will be to safeguard data security and ownership.

Prior to embarking on the technical or IT development of the digital platform, GPSNR and the Capacity Building Working Group is seeking to conduct an Assessment of Status Quo and Evaluation

The consultant will collect the information via desktop study and information provided by the Working Group/Secretariat. The consultant would also be expected to conduct a number of stakeholder interviews (including but not limited to GPSNR member companies with relevant experience and digital tools, as well as smallholders within and beyond GPSNR) based on the criteria set out below. Regular contact and provision of updates to the Capacity Building Working Group and Knowledge Sharing Platform Task Force together with the Secretariat will be required.

It is estimated that there will be the need for at least one virtual meeting every two weeks over the course of the project.

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with proven experience relevant to this project.
  2. Examples of previous relevant work should be provided as well.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to 7 January 2022 to be considered. Proposals should be submitted to yeo.siyuan@gpsnr.org for consideration. You may also reach out to this contact for any questions or clarifications.
  7. GPSNR anticipates shortlisting at least two individuals or firms to have more in-depth discussions with and will make an award to one of these “down-selected” individuals or firms.

The submission should address, at minimum, the following:

Review of Existing Digital Applications

  • What are the existing apps/platforms on rubber (or other agricultural commodities) available and what are the advantages and disadvantages of each?
  • Are there existing platforms that could be expanded to incorporate the necessary functions or solutions to be used as template? (This could be specified with the consultant)

Assessing Smallholders’ Capacities and Needs

  • What are the technological constraints and capacities of smallholders?
  • What technology is best suited to address smallholders’ needs (smartphone technology)?
  • What functions or content of the Platform would smallholders prioritise?
  • What technical platform is meaningful (concerning the digital literacy of smallholders, and global application in diverse developing countries)?
  • How can we reach smallholders who are not familiar with digital technologies?

This should be conducted through a needs review comprising a representative set of stakeholders (including but not limited to smallholders, considering countries, farm size, gender, etc.)

GPSNR will facilitate virtual access and engagement with GPSNR smallholder members where applicable and requested by the consultant.

This RFP is also not limited in scope to smallholders or stakeholders in any specific geographical region, given that the eventual Knowledge Sharing Platform is expected to be globally used.

Project Timelines

The Request for Proposal timeline is as follows:

Activity Due Date
Release of RFP 10 Dec 2021
Submission Deadline for Proposals 7 Jan 2022
Contract Award 21 Jan 2022
Implementation to Begin 28 Jan 2022
First Review March 2022
Second Review May 2022

The work shall begin by January 2022 and the various phases shall be completed in accordance with the dates outlined in the timeline below:

Budget

The Platform is anticipating that a total budget of up to 18,000 EUR (subject to change) be allocated to this engagement with an additional amount available to support planned and approved travel.

Payment terms shall be:

  • 20% at the signing of the contract
  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
  • 50% on delivery of the final report

The allocation of the payment shall be based on the net amount after travel expenses are incurred and documented.

Evaluation Factors

GPSNR will rate proposals based on the following factors, incorporating the overall quality of the proposal and consultant:

  1. Responsiveness to the requirements set forth in this RFP;
  2. Relevant past performance and experience;
  3. Samples of work;
  4. Cost, including an assessment of total cost of ownership;
  5. Technical expertise/experience of bidder and bidder’s staff;
  6. The ability to collect information at the global and local level.

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

Download RFP here

Contact Person: Yeo Siyuan  – yeo.siyuan@gpsnr.org

More To Explore

Request For Proposal – GPSNR-RFP-A02-029-Risk Taskforce Traceability Pilot Field Trial – Thailand

Introduction & Background

 

The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include tire manufacturers, rubber suppliers and processors, vehicle makers and NGOs.

The Risk Subgroup of GPSNR is seeking a consultant/field team to identify, test, evaluate and report on what effort may be required for a rubber processor to map their supply shed (i.e., all the farms that they are sourcing from) in complex supply chains such as in Indonesia and Thailand. 

 

Objectives

The goal of the pilot is to investigate what effort (i.e., time, effort, cost, labour) may be required for a rubber processor to map their supply chain in complex supply chains such as Indonesia and Thailand.

The goal of this pilot is to map at least 300 small holder farmers supplying one processing mill each in Thailand. The subgroup is open to negotiation on the total number of small holder farms mapped based on the service provider’s experience and estimation.

The service provider should work with the GPSNR Risk Subgroup and the participating processors from Thailand and their dealers to:

  1. Keep track of time and costs of all mapping related activities throughout the study, calculate time and cost of mapping each farm, and provide them to their GPSNR Point of Contact at the end of the survey.
  2. Register and map farmers using field-based mapping or in combination with remote sensing that is crossed checked with field-based mapping samples. The service provider is welcomed to use their own method.
    1. Collect and provide the shapefiles from the mapping at the end of the project to the point of contact and the participating processor.
  3. Ask farmers to answer the RubberWay questionnaire.
  4. Ask farmers to answer the HCVRN Nature Positive Farming questionnaire.
  5. Unless automatically uploaded, submit farmers’ responses to the respective databases and the GPSNR point of contact at the end of each day for compilation.
  6. Record the effort required to convince 300 farmers per processing mill to complete all 3 tools.
    1. Number of dealers and farmers contacted to identify 300 farmers willing to participate in study.
    2. Total person hours required to identify 300 willing suppliers.
    3. Details of incidental (not staff time) expenses required to identify 300 willing farmers.
  7. Record the effort required/difficulty to convince the super dealers/suppliers to participate in the study, based on the supplier tiers & on the pilot sample goal.
    1. Skip Tier 1 farms
    2. Not more than 100 responses from Tier 2
    3. 200 responses from Tier 3 and 4 suppliers

Scope of Work

  • Field data collection has to be completed by the second month from the starting date of the project.
    • Ideally, field teams are experienced in 2 or more of the above tools (RubberWay questionnaire, HCVRN Nature Positive Farming questionnaire and field-based or remote sensing-based mapping), else training will be provided. Please indicate which tools your team is experienced in using we will provide the necessary training.
      • If remote-sensing based is preferred by the service provider, please respond with the process and note that the data has to be cross-checked with field-based samples.
    • Field teams have to be able to speak the local language at each survey location(i.e., Thai).
  • GPSNR estimates the necessary activities per farm and the time required to conduct them to be as follows:
  1. Explain purpose of visit (~15 mins)
  2. Get permission for personal data collection to ensure data protection (~5mins)
  3. Map farm via mapping based on the mapping method chosen by the service provider (e.g., field-based mapping or remote sensing cross-checked with field samples) (~90mins).
    1. Mapping for farms <4 hectares:
      1. Polygon mapping or GPS mapping is up to the discretion of the service provider.
    2. Polygon mapping for farms above 4 hectares:
      1. This is based on the EU regulation (see Annex A) that a polygon would be required for farmers over 4 hectares.
      2. At least 10% (~30 of the 300 farms must be polygon mapped)
    3. Fill in RubberWay questionnaire (~30mins)
    4. Fill in HCVRN Nature Positive Farming questionnaire (~30mins – 1 hour)
    5. Verify data before departure (~10mins)
  • GPSNR assumes:
    • Total time required: ~approximately 180 mins/3 hours per farm per field assistant.
    • Farms likely to be covered per day: 2 farms.
    • Total number of field assistant days required assuming 2 farms per day: 450 days
    • Total weeks required for 1 field assistant assuming 5 work days per week: 90 weeks
    • Total weeks required for two processors assuming 10 field assistants working simultaneously in one country: 9 weeks
    • This is an estimation of the time taken, we look forward to a comparison with the final recorded timings.
  • If you have other ideas on how to achieve the above objectives, please provide details about how you would design the study

Expected Deliverables

Specifically, GPSNR expects the consultant to:

 1. Map at least 300 farmers supplying to the participating processor in Thailand and provide the shapefiles to the processor and the GPSNR point of contact.

a.      There should at least be 10% (~30 farms out of 300 farms) that are polygon mapped, based on the requirements mentioned above and in Annex A.

 2. We would like a detailed account of the time and resources spent on 1. travelling to the farm, 2. On the farm and 3. Data analysis

a.      We would like to see a breakdown of the total time spent in each component. E.g., Total reported time spent on 1 farm + 1 analysis = 8hours, within that 2 hour (time taken to travel to farm), 0.5 hours (convincing the farmer), 0.5 hours (communicating to farmer about the tool), 20 mins (Mapping the farms), 30 mins (HCVN questionnaire), 30 mins (Rubberway questionnaire)

 3. An evaluation of the merits and limitations of each tool

a.      E.g., 3/11 farmers surveyed were more apprehensive about the mapping tool due to fear of exposing their location.

 4. A recommendation of the scalability of this pilot

a.      Can the same estimated cost/time/labour be replicated in other regions/jurisdictions within the same country?

b.     E.g., $X/farm is calculated but is not scalable due to what reason(s).

Proposal Format and Contents

The proposal should include the following:

1. A workplan that outlines the key activities towards the deliverables outlined in Expected Deliverables above

2. The timeline and key stages of operations based on Project Timeline below

3. Budget, including detailed breakdown of expected manpower, logistics, and costs based on Budget below

4. Description of past work and technical expertise that is relevant to this RFP

A list of project team members with their roles in the project and associated qualifications.

 

Submission Guidelines & Requirements

The following submission guidelines & requirements apply to this Request for Proposal:

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project.
  2. Examples of previous relevant work should be provided.
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable.
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project as well as hourly rates and an estimated total number of days.
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company.
  6. Proposals must be received prior to the 10 March 2023 to be considered. Proposals should be submitted to stefano.savi@gpsnr.org and cheryl@gpsnr.org for consideration.
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic.

Project Timelines

 

Proposals submitted by consultant to stefano.savi@gpsnr.org

10 March 2023

Selection of consultant /
Notification to Unsuccessful Bidders

16 March 2023

Contract Award / Notification to Unsuccessful Bidders

17 March 2023

Initial methodology presentation and Q&A with subgroup

23 March 2023

Training sessions for tools 

Late March – Early April 2023

Update session with subgroup 

April 2023

Final Draft report and conclusion of project 

July 2023

 

Budget

The Platform is anticipating that a total budget of no more than €25,000 be allocated to this engagement.

Payment terms shall be:

·        20% at the signing of the contract

·        30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan.

·        50% on delivery of the final report

The allocation of the payment shall be based on the net amount after travel expenses, if deemed necessary by both the consultant and Secretariat, are incurred and documented.

 

Evaluation Factors

 GPSNR will rate proposals based on the following factors, with cost being the most important factor:

1.        Responsiveness to the requirements set forth in this Request for Proposal

2.      Relevant past performance/ experience

3.      Samples of work

4.     Cost, including an assessment of total cost of ownership.

5.      Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.

 

Annex

Annex A: EU Deforestation Regulation

‘geolocation’ means the geographical location of a plot of land described by means of latitude and longitude coordinates corresponding to at least one latitude and longitude point and using at least six decimal digits. For relevant commodities other than cattle, for plots of land of more than 4 hectares, the geographical location shall be provided using polygons, meaning sufficient latitude and longitude points to describe the perimeter of each plot of land.

Text obtained from Article 2: Definitions, point (29) of the Deforestation Regulation consolidated text dated 20/12/22Deforestation Regulation consolidated text 20-12-22


View RFP Document here

Request For Proposal – GPSNR-RFP-C03-036-Review and support the development of a Central Repository

Introduction & Background
The Global Platform for Sustainable Natural Rubber (GPSNR) is an international, multi-stakeholder, voluntary membership initiative seeking to lead improvements in the socioeconomic and environmental performance of the natural rubber value chain. Members of the platform include rubber products manufacturers, natural rubber suppliers and processors (PPTs), end users, smallholders, and civil society organisations. 

The Manufacturer’s Subgroup (SG) consists of GPSNR members who are rubber product manufacturers only.  Traditionally tracing each companies supply chain takes on an individualistic approach due to the sensitive nature of the data. However, to expedite the enhancement of traceability in view of EUDR, the SG has decided on a collaborative approach by developing a Central Repository. 

The Central Repository functions as a database for storing polygons and supply chain information contributed by individual members. It will also link the smallholders, PPTs and manufacturers on a single platform while reducing duplicated mapping efforts between different manufacturers. The Repository should allow for easy extraction of information for GPSNR’s Due Diligence System and be integrated with the EU information system. Moreover, the repository should either integrate different Risk, Traceability and Deforestation mapping tools or have the data formatted in a way that allows for seamless input into the tools. 

In addition, considering the sensitive nature of individual companies’ supply chain information, the platform must implement various layers of access control. This will ensure that each manufacturer can only access information pertaining to their own supply chain. Furthermore, the repository should have distinct tiers of users, including end users, manufacturers, PPTs, and smallholders, with each tier granted access privileges relevant to their role.

Objectives and Scope of Work/ Deliverables
GPSNR expects the consultant to deliver the following:

  1. Craft a database that stores polygon and supply chain information to the plantation level and allows for the upload of geo-mapping information. 
    1. The database should also have an online dashboard view of mapped / Mapping-in-progress farmlands, contract/seller invoice information – outstanding and shipped)

  2. The Central Repository should allow data to flow to and from or store data in a way that is compatible for the uses below:
    1. Traceability tool providers (Eg – Koltiva, TRST01, Harmuni (Agridence etc))
    2. Deforestation mapping tools (Eg – LiveEO, Satelligence, Starling etc)
    3. Risk assessment systems/tools (Eg – ASI Tool or Others as available etc)

  3. Create levels of access authorizations for different accounts within the platform – 
    1. User accounts for uploading geo mapped data
    2. Access to viewing the geo-mapped data linked to user accounts for the PPTs and Manufacturers
      1. Users should only have access to information from within their own supply chains or information that they input to the repository
      2. Users should be able to form links across different tiers. For example, users should be able to form links between smallholders and PPTs, PPTs and manufacturers. 
      3. When there are several members which require access to geo mapped data from one user, the platform should have the ability to extend access authorization to multiple users.
    3. Extracting information from Due Diligence Systems and integrating it with the EU Information System (this should be limited to manufacturers only)

  4. The platform should be compliant with applicable data privacy norms and regulations which include but are not limited to the GDPR and PDPA.

  5. A fee structure including management of shared cost arising from overlapping access to geo mapped data.

  6. Data protection and cyber security policies

  7. Service Level Agreements including downtime, maintenance, customer support and service, updates.

  8. Data Backup

  9. Server location – Singapore (Preferred)

  10. A timeline for development of the Central Repository (milestones with details)

  11. Optional – Deforestation monitoring tool integrated with central repository and the applicable fee structures

Proposal Format and Contents
The proposal should include the following:

  1. A workplan that outlines all key activities of the deliverables (as outlined in Expected Deliverables above)
  2. Timeline and key stages of operations (based on Project Timeline below) 
  3. Budget, including detailed breakdown of expected manpower, logistics, and costs 
  4. Description of past work and technical expertise that is relevant to this RFP
  5. A list of project team members with their roles in the project and associated qualifications.

Submission Guidelines & Requirements 
The following submission guidelines & requirements apply to this Request for Proposal: 

  1. Proposals will only be accepted from individuals or firms with experience relevant to this project. 
  2. Examples of previous relevant work should be provided as well. 
  3. A technical proposal must be provided that is not more than 4 pages. This technical proposal must provide an overview of the proposed solution as well as resumes of all key personnel performing the work. In addition, the technical proposal should provide a proposed schedule and milestones, as applicable. 
  4. A price proposal must be provided that is not more than 1 pages. This price proposal should indicate the overall fixed price for the project, a cost breakdown, and daily rates and an estimated total number of days. 
  5. Proposals must be signed by a representative that is authorized to commit bidder’s company. 
  6. Proposals should be submitted to stefano.savi@gpsnr.org and aidan@gpsnr.org for consideration. 
  7. GPSNR reserves the right to amend the scope and budget of this RFP in order to get the most suitable consultant for each topic. 

Project Timelines 

RFP Published

4 Sep 2023

Proposal Submission Deadline

25 Sep 2023

Contract Awarded

9 Oct 2023

First consultation with Manufacturer’s Subgroup 

23 Oct 2023

Bi-weekly progress updates

23 Oct – 18 Dec

Final Report + Deliverable submission

19 Dec 2023

Budget
The Platform will review budget proposals from service providers and the budget will comprise an important part of awarding the contract.

Payment terms shall be:

  • 20% at the signing of the contract
  • 30% at the midpoint date to be agreed upon and memorialized in the contract based on the submitted work plan
  • 40% on go-live 
  • Balance 10% – 1 month after go-live

Evaluation Factors
GPSNR will rate proposals based on the following factors, with cost being the most important factor:

  1. Responsiveness to the requirements set forth in this Request for Proposal
  2. Relevant past performance/ experience
  3. Samples of work
  4. Cost, including an assessment of total cost of ownership
  5. Technical expertise/experience of bidder and bidder’s staff

GPSNR reserves the right to award to the bidder that presents the best value to GPSNR as determined solely by GPSNR in its absolute discretion.